The Rolling Horizon: What Passenger Facility Charge Expiration Dates Measure at U.S. Airports

The expiration date on the FAA's passenger facility charge list reads like an end date. Across ten years of reports it has behaved like a horizon that moves outward almost as fast as the calendar.

By Dr. Clay W. Carter, DBA, CFA, FRM · Working Paper · September 2026 · 21 min read

Abstract

The Federal Aviation Administration publishes, every month, a list of every airport authorized to collect a passenger facility charge, with the level of the charge, the total amount approved and an expiration date. The expiration date is the figure readers look for first, and it is easily misread. This paper reads the list at four dates, December 2016, September 2021, September 2025 and September 2026, and pairs it with calendar year 2025 enplanements, the agency's category reports and fiscal 2025 financial filings. On 30 September 2026, 415 locations held $140.29 billion of approved authority, and the 31 large hubs held 75.4 percent of the authority at locations then collecting. The median collecting location had 5.8 years of authority left, and 60 locations, four of them medium hubs, were due to reach their expiration date within two years. The central finding is that the expiration date is a rolling horizon rather than an end date. The median remaining life was between 5.7 and 6.0 years at all four dates, and among the 333 locations collecting in both December 2016 and September 2026 the median move in expiration date was 9.2 years across 9.75 years of elapsed time. On the agency's category reports, approved authority grew $46.44 billion over the period, and terminal projects and approved financing costs account for 82.9 percent of that growth. In the twelve months to September 2026 approved authority rose $7.90 billion, half of it at Denver. Nationally, collections in 2025 came to $3.97 per enplanement at collecting airports, about 90 percent of the $4.39 an airport keeps from a $4.50 charge, and the $4.50 ceiling set in 2000 is worth $2.31 in 2000 dollars at August 2026 prices. The paper closes with a reading protocol for anyone evaluating a specific airport.

1. Introduction

A passenger facility charge is a local fee of up to $4.50 that an airline adds to a ticket and remits to the airport, which may spend it only on eligible projects that the Federal Aviation Administration has approved or, under the statute's notice procedure, has not objected to (49 U.S.C. 40117). The agency's monthly list of approved locations is the public record of that program, airport by airport. It is the document a bond analyst, an airline station manager, an airport board member or a real estate professional will find first when asking how an airport pays for its capital program.

The list invites one reading in particular. Each row carries an expiration date, and a reader who sees that a charge expires in 2027 will reasonably conclude that the airport loses a revenue stream in 2027. For most airports that conclusion would be wrong. The expiration date is an estimate that the airport and the agency revise as traffic changes and as new projects are approved, and across the last decade it has moved later almost as fast as the calendar has.

This paper measures that behavior. Section 2 sets out the rules that produce the list. Section 3 describes the data. Section 4 shows where the approved authority sits. Section 5 examines the expiration date as a horizon rather than an end point. Section 6 reports what the authority pays for. Section 7 reports what an enplanement actually yields and what the $4.50 ceiling is now worth. Section 8 places the findings against current legislation. Section 9 sets out a reading protocol for a single airport, and Sections 10 and 11 state the limitations and conclusions.

2. The Rules That Produce the List

2.1 The charge

The statute authorizes an eligible agency to impose a charge of $1, $2, $3, $4 or $4.50 on each paying passenger boarding at an airport it controls, to finance an eligible airport-related project, "including making payments for debt service on indebtedness incurred to carry out the project" (49 U.S.C. 40117(b)(1)). The FAA Reauthorization Act of 2024 folded the $4 and $4.50 levels, which had sat in a separate paragraph, into that single authority (Pub. L. No. 118-63, sec. 776).

The charge may not be collected for more than two boardings on a one-way trip, from a passenger traveling on a frequent flier award or otherwise not paying for the transportation, on flights between points in Hawaii, on aircraft of fewer than 60 seats in Alaska, on travel to an essential air service point for which compensation is paid, or on charter travel paid for by the Department of Defense (49 U.S.C. 40117(e)(2)). The collecting airline keeps $0.11 of each charge as compensation (14 CFR 158.53(a)(1)).

2.2 Approval, amount and duration

The agency may approve a charge only if the amount and duration "will result in revenue ... that is not more than the amount necessary to finance the specific project" (49 U.S.C. 40117(d)(1)). A charge above $3.00 for a terminal or surface transportation project also requires a finding that the airport has made adequate provision for its airside needs (49 U.S.C. 40117(d)(4)). Under 49 U.S.C. 40117(l), as amended in 2024, an eligible agency may instead impose a charge by notice rather than by application; the agency acknowledges the notice and may object only on the grounds the statute lists (Pub. L. No. 118-63, sec. 776).

The regulations define the charge expiration date as "the date on which carriers are to cease to collect a PFC" (14 CFR 158.3). An airport that has begun an approved project may keep collecting until that date is reached, until collections plus interest equal the allowable cost of the approved project, or until the authority is terminated (14 CFR 158.31). The date is an estimate from the start: the airline consultation notice, the public notice and the application itself each call for an "estimated charge expiration date" (14 CFR 158.23, 158.24, 158.25).

The estimate is not fixed. An airport may amend an approved charge to raise or lower the level or the total approved revenue; an increase in the level, a change in a project's scope, an increase of more than 25 percent in the approved amount of a project of $1 million or more, or an amendment that takes a smaller project to $1 million or more requires further airline consultation and public comment (14 CFR 158.37). It may also file new applications for new projects. Either route can move the expiration date.

2.3 The trade against federal grants

A medium or large hub that imposes a charge gives up part of its federal Airport Improvement Program apportionment. The FAA Reauthorization Act of 2024 reduced that reduction: for a charge above $3.00 the airport now forgoes 60 percent of projected charge revenue, capped at 60 percent of the apportionment, in place of the former 75 percent, and for a charge of $3.00 or less 40 percent in place of 50 percent (49 U.S.C. 47114(f)(1); Pub. L. No. 118-63, sec. 713).

3. Data and Method

3.1 The approved locations reports

The agency's report of approved locations, collections and expiration dates is published monthly in spreadsheet form (Federal Aviation Administration 2026a). Each row is one charge period at one location and records the associated city, state, airport name, location identifier, hub size, charge level, start date, expiration date and, on the location's final row, the total approved for the location. The report notes that the total "includes all the collections at the location," so it is a lifetime figure that combines what has been collected since the charge began with what remains to be collected.

Four reports are used: December 31, 2016 (Federal Aviation Administration 2016a), September 30, 2021 (Federal Aviation Administration 2021), September 30, 2025 (Federal Aviation Administration 2025) and September 30, 2026. The September 2026 file has 1,074 charge rows at 415 locations and a total of $140,290,550,317, which matches the total printed in the file.

3.2 Definitions

A location is treated as collecting on a report date if that date falls on or after the start date and before the expiration date of one of its rows. Remaining horizon is the time from the report date to the last expiration date on the location's rows, in years of 365.25 days. A location with no approved authority is not treated as collecting. Hub size is the code the agency prints in each report (L, M, S, N for large, medium, small and nonhub primary airports, CS for nonprimary commercial service, and GA for the few general aviation locations listed; older files also carry an R code and a few blanks).

On this rule 364 locations were collecting on 30 September 2026, 358 of them at $4.50. The agency's own statistics for the same date report 366 and 360 (Federal Aviation Administration 2026b), and for December 2016 the rule gives 355 against the agency's 356 (Federal Aviation Administration 2016b). The agency does not publish the rule behind its count. The zero-authority test matters in one place: five Puerto Rico locations appear in the September 2026 file with one-month rows beginning 1 September 2026 and no approved amount, and they are excluded. Counted in, they would add five locations to the group due within two years and lower the median horizon by about six and a half weeks. Where a program total is stated, the agency's figure is used.

3.3 Identifier harmonization

Two identifiers were adjusted so locations can be followed across reports. The location reported as PBI in earlier files appears as DJT, President Donald J Trump International, in the 2026 file, with the same city and charge history, and the two are treated as one location. In the December 2016 file both Worland, Wyoming rows carry "GA" in the identifier field; they are assigned to WRL.

3.4 Other sources

Program collections by calendar year and the agency's location counts come from its key statistics report (Federal Aviation Administration 2026b, 2016b). Uses of approved authority come from its category reports for December 2016 and September 2026, which report approved amounts by project type with financing costs shown either as a lump sum or spread across projects (Federal Aviation Administration 2016c, 2026c, 2026d). Enplanements are the agency's calendar year 2025 commercial service counts (Federal Aviation Administration 2026e). Fiscal 2025 charge revenue, debt service and enplanements by airport come from the Form 5100-127 operating and financial summaries in the agency's Certification Activity Tracking System (Federal Aviation Administration 2026f). Price levels are the Consumer Price Index for All Urban Consumers, not seasonally adjusted (U.S. Bureau of Labor Statistics 2026).

3.5 What the list does not contain

The report gives lifetime approved authority by location but not lifetime collections by location. Remaining authority, the dollar amount still to be collected, cannot be read from it directly. The expiration date is the report's only forward-looking field, which is one reason it carries so much weight with readers.

4. Where the Authority Sits

4.1 Concentration

The program is national in reach and concentrated in dollars. Locations collecting on 30 September 2026 accounted for 969.3 million of the 973.0 million commercial service enplanements recorded in calendar 2025, or 99.6 percent. Every airport classified as a large, medium or small hub in the calendar 2025 enplanement data was collecting. Of 402 primary airports in that data, 65 were not, all of them nonhubs.

Table 1. Approved authority and remaining horizon by hub size, locations collecting on 30 September 2026.

Hub sizeLocationsApproved authorityShareMedian years leftInterquartile range (years)
Large31$105.67 bn75.4%12.39.0 to 19.3
Medium32$20.90 bn14.9%6.73.6 to 11.6
Small77$10.49 bn7.5%7.02.7 to 13.1
Nonhub189$3.06 bn2.2%4.62.2 to 10.7
Nonprimary commercial service30$38.1 mless than 0.1%5.93.4 to 9.3
General aviation5$5.4 mless than 0.1%1.91.8 to 6.4
All collecting364$140.16 bn100%5.82.6 to 12.8

Source: author's computation from Federal Aviation Administration (2026a).

The 31 large hubs hold three quarters of the authority at collecting locations. The first ten locations by approved amount hold $59.12 billion between them, 42.1 percent of all authority in the report.

4.2 Locations ranked by approved authority

Table 2 lists the first 25 collecting locations ranked by approved authority. The last column divides lifetime authority by calendar 2025 enplanements. It is not a rate, since the numerator covers decades of collections and the denominator one year of traffic, but it places airports of very different size on a common scale. At $4.50 per boarding, a figure of $180 corresponds to 40 years of the airport's current traffic paying the full charge.

Table 2. Twenty-five collecting locations ranked by approved authority, 30 September 2026.

AirportIDApproved authorityExpiration dateYears leftApproved per 2025 enplanement
Los Angeles InternationalLAX$9.51 bnJul 205528.8$261
Hartsfield-Jackson Atlanta InternationalATL$7.84 bnDec 204014.2$152
Denver InternationalDEN$7.56 bnJul 204922.8$189
Chicago O'Hare InternationalORD$6.56 bnFeb 203912.3$161
Dallas-Fort Worth InternationalDFW$5.66 bnOct 203812.0$137
Orlando InternationalMCO$5.30 bnJul 204619.8$189
Charlotte/Douglas InternationalCLT$4.86 bnOct 205832.0$188
Harry Reid InternationalLAS$4.56 bnNov 205327.1$172
Seattle-Tacoma InternationalSEA$3.84 bnJan 204316.3$151
San Diego InternationalSAN$3.42 bnOct 206236.0$270
John F. Kennedy InternationalJFK$3.25 bnJul 20303.8$106
Detroit Metropolitan Wayne CountyDTW$3.13 bnFeb 20347.3$192
Phoenix Sky Harbor InternationalPHX$3.10 bnMay 20369.6$124
George Bush IntercontinentalIAH$2.81 bnApr 203912.5$121
Miami InternationalMIA$2.73 bnJan 203912.3$103
Newark Liberty InternationalEWR$2.52 bnJul 20303.8$107
Chicago Midway InternationalMDW$2.48 bnMay 205629.6$264
Boston Logan InternationalBOS$2.46 bnJan 20369.3$117
Washington Dulles InternationalIAD$2.44 bnDec 203812.2$176
San Francisco InternationalSFO$2.32 bnDec 20304.2$88
Minneapolis-St Paul InternationalMSP$2.29 bnAug 20292.8$131
Tampa InternationalTPA$2.16 bnApr 204417.5$179
Fort Lauderdale/Hollywood InternationalFLL$2.09 bnDec 20359.2$134
Salt Lake City InternationalSLC$2.08 bnApr 203710.5$155
Philadelphia InternationalPHL$1.88 bnDec 20282.2$127

Source: author's computation from Federal Aviation Administration (2026a, 2026e).

The ratio separates airports that have committed decades of future charges from airports whose approved authority is small relative to current traffic. San Diego, Midway and Los Angeles sit above $260 per enplanement, with expiration dates between 2055 and 2062. San Francisco at $88, Miami at $103 and Kennedy at $106 sit at the other end. San Francisco and Kennedy reach their expiration dates in 2030, but Miami's runs to 2039, so a low ratio does not by itself mean a near date.

4.3 Levels below the ceiling

Six collecting locations charge less than $4.50: Anchorage at $3.00, Orlando Sanford at $4.00, Destin-Fort Walton Beach at $3.00, Cape Cod Gateway at $3.00, Santa Fe at $3.00 and Massena at $3.00. Anchorage is the only medium or large hub below the ceiling. Every large hub collects at $4.50, as the agency's statistics also state (Federal Aviation Administration 2026b).

5. The Expiration Date Is a Rolling Horizon

5.1 The distribution today

The median collecting location had 5.8 years of authority left on 30 September 2026, with an interquartile range of 2.6 to 12.8 years. Sixty locations were due to reach their expiration date within two years, 102 within two to five years, 84 within five to ten, 82 within ten to twenty, and 36 had twenty years or more.

The two-year group is mostly small. It contains 41 nonhubs, two nonprimary commercial service locations and three general aviation locations, along with ten small hubs and four medium hubs. No large hub was within two years of its expiration date.

Table 3. Hub airports due to reach their charge expiration date within 24 months of 30 September 2026, ordered by expiration date and then identifier.

AirportIDHubExpiration dateApproved authority
John Glenn Columbus InternationalCMHMediumFeb 2027$454.9 m
Fairbanks InternationalFAISmallFeb 2027$38.4 m
Long Island MacArthurISPSmallMar 2027$94.1 m
Destin-Fort Walton BeachVPSSmallMar 2027$56.8 m
Cleveland Hopkins InternationalCLEMediumMay 2027$651.7 m
St. Pete-Clearwater InternationalPIESmallMay 2027$81.3 m
Greenville Spartanburg InternationalGSPSmallAug 2027$33.6 m
John Wayne/Orange CountySNAMediumAug 2027$384.3 m
Louisville Muhammad Ali InternationalSDFSmallJan 2028$183.8 m
McGhee TysonTYSSmallFeb 2028$123.0 m
Rogue Valley International-MedfordMFRSmallApr 2028$43.8 m
Tucson InternationalTUSSmallApr 2028$203.8 m
President Donald J Trump International, West Palm Beach (formerly listed as PBI)DJTMediumMay 2028$405.4 m
Eugene (Mahlon Sweet Field)EUGSmallJun 2028$64.9 m

Source: author's computation from Federal Aviation Administration (2026a).

At the other end, 27 locations have authority running to 2050 or later: five large hubs, three medium hubs, eight small hubs, eight nonhubs and three nonprimary commercial service airports. The final date in the list is March 2066, at Pullman-Moscow Regional. Among the large hubs, San Diego runs to October 2062, Charlotte to October 2058, Midway to May 2056, Los Angeles to July 2055 and Las Vegas to November 2053. Expiration dates this far out are consistent with a charge pledged to long-term debt, since approved financing costs are part of the approved amount (Section 6).

5.2 Four snapshots

If expiration dates were end dates, the stock of remaining authority would run down between approvals and the median horizon would drift toward zero. It does not.

Table 4. Remaining horizon at locations collecting on four report dates.

Report dateLocations collectingMedian years leftLarge hub medianShare within 2 yearsShare 20 years or moreTotal approved authority
31 Dec 20163555.9213.3318.3%9.0%$93.98 bn
30 Sep 20213685.9615.1319.8%8.2%$116.69 bn
30 Sep 20253635.7513.0016.0%8.8%$132.39 bn
30 Sep 20263645.7912.2516.5%9.9%$140.29 bn

Source: author's computation from Federal Aviation Administration (2016a, 2021, 2025, 2026a).

Over nearly ten years the median horizon has stayed between 5.7 and 6.0 years, the share of locations within two years of expiration between 16 and 20 percent, and the share with twenty years or more between 8 and 10 percent. Total approved authority in the approved locations reports rose 49 percent over the same period.

5.3 The same airports over time

Table 5 follows the locations that were collecting at both ends of each interval.

Table 5. Change in expiration dates at locations collecting at both report dates.

IntervalElapsed yearsLocationsMedian move in expiration dateLater by more than elapsed timeLater by up to elapsed timeUnchangedEarlier
Sep 2025 to Sep 20261.003590.00 years621626912
Sep 2021 to Sep 20265.003543.33 years1361078922
Dec 2016 to Sep 20269.753339.17 years1561313610

Source: author's computation from Federal Aviation Administration (2016a, 2021, 2025, 2026a).

In a single year three quarters of expiration dates do not move. Over five years a majority do, and over nearly ten years 287 of 333 locations had moved their dates later and 156 had moved them later by more than the time that had passed. Only 10 of 333 had an earlier date in 2026 than in 2016. The median location's date moved 9.17 years across an interval of 9.75 years, and the median expiration date of the group moved from January 2023 to November 2032.

Short horizons did not usually end the charge. Of the 65 locations within two years of their expiration date in December 2016, 58 were collecting in September 2026, and 44 had collected in every month in between. Of the 73 within two years in September 2021, 67 were collecting in September 2026 and 47 had collected in every month. Counting months from the row history in the September 2026 file, an unbroken gap of a year or more between charges occurred at seven of the airports still collecting in 2026, six nonhubs and Fresno, a small hub, which is one reason a short horizon deserves a closer look.

That is the sense in which the expiration date is a rolling horizon. A typical airport keeps five to six years of authority ahead of it and replaces authority as it collects, through amendments and new applications. The date in the report is the point at which the currently approved projects are expected to be paid for, and not necessarily the point at which the airport will stop charging.

5.4 Where the horizon moved in the last year

Approved authority across all locations rose $7.90 billion between September 2025 and September 2026, with increases at 78 locations collecting at both dates and decreases at 22.

Table 6. Eight locations ranked by increase in approved authority, September 2025 to September 2026.

AirportIDIncreaseExpiration date, Sep 2025Expiration date, Sep 2026
Denver InternationalDEN$3.96 bnOct 2031Jul 2049
San Diego InternationalSAN$1.82 bnMay 2040Oct 2062
Reno/Tahoe InternationalRNO$0.50 bnNov 2026Dec 2060
Tampa InternationalTPA$0.44 bnJun 2038Apr 2044
Baltimore/Washington InternationalBWI$0.25 bnMar 2040Sep 2045
Pensacola InternationalPNS$0.17 bnOct 2031May 2057
Tweed-New HavenHVN$0.17 bnMar 2026Nov 2053
Phoenix Sky Harbor InternationalPHX$0.13 bnSep 2034May 2036

Source: author's computation from Federal Aviation Administration (2025, 2026a).

Denver alone accounts for $3.96 billion, 50.2 percent of the year's increase, and moved its expiration date nearly eighteen years later. Reno and Tweed-New Haven show the pattern at smaller airports: each was within about a year of its expiration date in September 2025 and a year later held authority into the 2050s or 2060s. Decreases are real but smaller, led by Portland International at $191.4 million and Pittsburgh at $134.0 million.

Over the five years to September 2026, approved authority rose $23.60 billion. Denver ($3.96 billion), Los Angeles ($3.48 billion), San Diego ($1.82 billion), Charlotte ($1.62 billion), Atlanta ($1.50 billion) and Kansas City ($1.19 billion) account for $13.57 billion of it.

6. What the Authority Pays For

The agency's category reports divide lifetime approved authority by use. In the lump sum version, financing and interest costs approved for recovery through the charge appear as a single category; in the distributed version they are spread across the projects they finance (Federal Aviation Administration 2026c, 2026d).

Table 7. Approved authority by category, December 2016 and September 2026, with financing costs as a lump sum.

CategoryDecember 2016September 2026ChangeShare of change
Airside$16.70 bn$21.75 bn$5.06 bn10.9%
Terminal$29.99 bn$51.70 bn$21.72 bn46.8%
Other landside (land, security)$3.93 bn$4.02 bn$0.09 bn0.2%
Noise$3.36 bn$3.59 bn$0.23 bn0.5%
Ground access$5.99 bn$8.56 bn$2.56 bn5.5%
Financing and interest$30.75 bn$47.53 bn$16.78 bn36.1%
Denver (reported separately)$3.14 bn$3.14 bn$0.00 bn0.0%
Total$93.86 bn$140.29 bn$46.44 bn100%

Source: Federal Aviation Administration (2016c, 2026c) and author's computation.

The category reports put the December 2016 total at $93.86 billion, using a selection end date of 23 December 2016, against $93.98 billion in the approved locations report for 31 December 2016; the two reports use different cut-off dates, and Table 7 relies on the category reports throughout. Terminal projects and financing costs together account for $38.50 billion of the $46.44 billion added over the period, 82.9 percent. Their combined share of the stock rose from 64.7 percent to 70.7 percent. Airside projects, the runways, taxiways and aprons that dominate the federal grant program, account for 15.5 percent of lifetime authority and 10.9 percent of the decade's growth.

The distributed report makes the same point from another angle. With financing costs assigned to the projects they finance, landside projects account for 64.2 percent of lifetime authority and airside projects for 22.2 percent, and terminals alone for $84.94 billion (Federal Aviation Administration 2026d). Within terminals, new terminal construction accounts for $28.37 billion and terminal expansion for $27.25 billion.

In dollar terms, then, the charge has become a terminal finance instrument and a debt service revenue. That is consistent with the rolling horizon in Section 5: a charge that services bonds carries approved financing costs and an expiration date that extends across the repayment period, and a capital program built around terminals renews its authority each time a new phase is approved.

7. What an Enplanement Yields

7.1 The national figure

Airports reported $3,845,069,634 of charge collections for calendar 2025, net of the carriers' compensation and after corrections (Federal Aviation Administration 2026b). Locations collecting on 30 September 2025 recorded 969,169,284 calendar 2025 enplanements. Dividing one by the other gives $3.97 per enplanement.

A $4.50 charge leaves the airport $4.39 after the carrier's $0.11. The national yield is 90.4 percent of that figure. The remaining 9.6 percent likely reflects the two-boarding limit on connecting itineraries, award travel and the other statutory exemptions, the handful of locations charging less than $4.50, and timing differences between enplanement and remittance; none of these components is measured separately in the published data.

7.2 Airport by airport

Form 5100-127 reports each airport's charge revenue (line 8.4) and enplanements (line 16.1) for its own fiscal year (Federal Aviation Administration 2026g). Of 409 fiscal 2025 filings retrieved from the agency's system for commercial service airports, 323 came from airports that collected $4.50 in every month of the fiscal year. Keeping those with at least 100,000 enplanements and positive charge revenue leaves 208 airports.

Table 8. Charge revenue per enplanement, fiscal 2025, airports collecting $4.50 for the full fiscal year with at least 100,000 enplanements.

Hub size (calendar 2025)AirportsMedianInterquartile range
Large30$3.86$3.77 to $3.91
Medium33$3.88$3.76 to $4.00
Small76$3.99$3.82 to $4.14
Nonhub69$4.01$3.83 to $4.13
All208$3.94$3.80 to $4.09

Source: author's computation from Federal Aviation Administration (2026a, 2026e, 2026f).

The distribution is narrow. Outside Hawaii, 172 of 203 airports report between $3.50 and $4.39 per enplanement. Taken together, the 208 airports reported $3.77 billion of charge revenue on 979.0 million enplanements, or $3.85 each. Airports count their own enplanements for the form, and those counts run a median 1.3 percent above the agency's calendar 2025 figures for the same airports; on the agency's counts, 951.7 million, the same revenue gives $3.96 per enplanement, within a cent of the national figure in Section 7.1. At four airports, Alexandria, Laredo, Westmoreland County and Pago Pago, the two enplanement counts differ by a factor of 1.9 or more, and their yields are not interpreted here.

Hawaii is the exception the statute predicts. Flights between points in Hawaii are exempt from the charge (49 U.S.C. 40117(e)(2)(D)), and all five Hawaii airports in the sample fall below $3.00: Honolulu at $2.74, Kahului at $2.38, Kona at $2.12 and Lihue at $1.91. The fifth, Hilo, reports $35 of charge revenue for the year against 719,606 enplanements, which is likely a reporting error rather than a yield. Hilo and the four airports with mismatched enplanement counts remain in Table 8; dropping them moves no hub median by more than a cent and the overall median from $3.94 to $3.95.

Among large hubs other than Honolulu, fiscal 2025 yields run from $3.38 at Baltimore/Washington to $4.15 at Miami. The connecting hubs sit in the middle of that range: Atlanta and Charlotte at $3.81, Dallas-Fort Worth at $3.88 and O'Hare at $3.89. Whatever the two-boarding limit removes at connecting hubs is not visible at this level of aggregation.

Seventeen airports report more than $4.39 per enplanement, which a $4.50 charge cannot produce from one year of collections on the reported enplanements. The likely sources are timing differences between collection and recognition as revenue, and enplanement counts that differ from the base on which the charge is collected. For a reader estimating an airport's charge revenue outside Hawaii, about $3.85 per enplanement at large and medium hubs and about $4.00 at small hubs and nonhubs, at the $4.50 level, is a reasonable starting point, to be checked against the airport's audited statements.

7.3 What $4.50 is now worth

The $4.50 level dates from the Wendell H. Ford Aviation Investment and Reform Act for the 21st Century, enacted 5 April 2000 (Pub. L. No. 106-181, sec. 105). The Consumer Price Index for All Urban Consumers averaged 172.2 in 2000 and stood at 334.980 in August 2026, a ratio of 1.945 (U.S. Bureau of Labor Statistics 2026). At August 2026 prices, $4.50 buys what $2.31 bought in 2000, and the 2000 ceiling would be $8.75 if it had kept pace with consumer prices. Construction costs, which are what the charge actually buys, are not measured by this index.

8. The Legislative Setting

The Rebuilding America's Airport Infrastructure Act, H.R. 3746, was introduced on 5 June 2025 and referred to the Subcommittee on Aviation on 6 June 2025. It would raise the maximum to $5.50 for 2027, $6.50 for 2028, $7.50 for 2029 and $8.50 from January 2030, adjusted annually for inflation thereafter (H.R. 3746, 119th Cong., sec. 2). The bill status record shows no action after referral to the subcommittee (U.S. Government Publishing Office 2026).

A static estimate shows the scale at stake. If every location collecting at $4.50 moved to $8.50 with no change in traffic or collection ratio, the airport's net revenue per charge would rise from $4.39 to $8.39, or 91.1 percent. Applied to calendar 2025 collections of $3.85 billion, that is about $3.50 billion a year before the annual inflation adjustment the bill applies from 2030. The base includes the few locations charging less than $4.50, which the hypothetical leaves unchanged, so the figure slightly overstates the increase. Two things would make the realized figure lower: not every airport would impose the new maximum, and a higher ticket price would reduce some travel. When the Government Accountability Office modeled cap increases in 2014, it found that they would significantly increase collections but could marginally slow passenger growth and reduce total Airport and Airway Trust Fund revenue by roughly 1 percent (Government Accountability Office 2014).

The rolling horizon has a direct bearing on that debate. An argument that airports need a higher cap because their authority is running out cannot rest on the expiration dates in the approved locations report, which have moved outward for a decade. An argument that the real value of the charge has roughly halved can rest on Section 7.3. The two claims are different, and the data supports the second more directly than the first.

9. Reading the List for a Single Airport

For anyone evaluating a specific airport, the report can be read in five steps.

First, confirm the level and the start date of the current row. At a hub a level below $4.50 is uncommon: in September 2026 only Anchorage, Orlando Sanford and Destin-Fort Walton Beach among hub airports charged less.

Second, compute the remaining horizon, then compare it with the five to six years that is typical. A short horizon at a hub with an active capital program usually means an application or amendment is coming, and the airline consultation and public notice required before filing are the first public sign of it (14 CFR 158.23, 158.24).

Third, divide approved authority by annual enplanements. A figure well above the peer group can indicate that decades of future charges are committed, often to debt, in which case the charge revenue is not available for new projects until those commitments are met.

Fourth, compare the current report with the same month a year earlier. A jump in approved authority and a much later expiration date, as at Denver, San Diego or Reno in the last year, is a public record that new charge authority has been approved.

Fifth, read the airport's Form 5100-127, where line 8.4 reports charge revenue for the fiscal year. The glossary defines line 15.2 as line 15.1 debt service less the charges used to pay it (Federal Aviation Administration 2026g), but the line itself is titled "Debt service, net of PFCs and Offsets," and charges applied to debt service in a year can come from balances accumulated in earlier years. Of the 61 large and medium hubs in the Section 7.2 sample that reported debt service, nine reported no difference between the two lines, including Kennedy, Newark, LaGuardia and San Diego, and 15 reported a difference larger than their charge revenue for the year. The difference between lines 15.1 and 15.2 does not line up with line 8.4 in any consistent way, and it is a question to put to the airport's audited financial statements rather than an answer.

10. Limitations

The approved locations report does not provide lifetime collections by location, so remaining authority in dollars cannot be measured, and the horizon analysis rests entirely on the agency's estimated dates. Those estimates depend on traffic assumptions that the report does not disclose.

Hub size is taken from each report as printed, and hub classifications change from year to year. The collecting rule used here counts two fewer locations than the agency's statistics for September 2026 and one fewer for December 2016. The category reports cover lifetime approvals, not spending, and a project approved for charge funding may be amended, reduced or withdrawn. The national yield in Section 7.1 divides calendar year collections by calendar year enplanements at locations collecting at a single date, which slightly misstates the base for locations that started or stopped during the year.

11. Conclusion

The passenger facility charge is collected at airports that handle 99.6 percent of commercial service enplanements, three quarters of its approved authority sits at the 31 large hubs, and more than 80 percent of the growth in that authority over the last decade went to terminal projects and to approved financing and interest costs.

The expiration date is the field readers rely on, and on its own it means little. Across four reports and nearly ten years, the median collecting location has held between 5.7 and 6.0 years of authority, and at locations collecting at both ends of the period the median move in expiration date was 9.2 years in 9.75. A date two years out at a hub with a capital program is more often a signal that an application is coming than that a revenue stream is ending. A date three or four decades out is consistent with a charge pledged to long-term debt.

What the charge buys has changed more than what it is called. Its face value has not moved since 2000, its real value has roughly halved, and the program has shifted toward terminals and debt service. A reader who wants to know where an airport stands should read the level, the horizon, the authority per enplanement and the change from last year together, and then open the airport's financial filing.

This paper is research and general information for professionals evaluating airports and airport real estate. It is not investment, legal or appraisal advice and does not create an engagement. All figures are the author's computation from the published federal files cited and are subject to the limitations in Section 10.

References

14 CFR Part 158, Passenger Facility Charges, including secs. 158.3, 158.23, 158.24, 158.25, 158.31, 158.37 and 158.53. Electronic Code of Federal Regulations, current as of 25 September 2026. https://www.ecfr.gov/current/title-14/chapter-I/subchapter-I/part-158

49 U.S.C. 40117, Passenger facility charges. https://www.law.cornell.edu/uscode/text/49/40117

49 U.S.C. 47114, Apportionments, subsection (f). https://www.law.cornell.edu/uscode/text/49/47114

FAA Reauthorization Act of 2024, Pub. L. No. 118-63, 138 Stat. 1025, secs. 713 and 776. https://www.congress.gov/118/plaws/publ63/PLAW-118publ63.pdf

Federal Aviation Administration. 2016a. PFC Approved Locations, Collections, and Expiration Dates, as of 12/31/16. https://www.faa.gov/sites/faa.gov/files/airports/pfc/monthly_reports/2016/airports.xlsx

Federal Aviation Administration. 2016b. Key Passenger Facility Charge Statistics as of December 31, 2016. https://www.faa.gov/sites/faa.gov/files/airports/pfc/monthly_reports/2016/stats.pdf

Federal Aviation Administration. 2016c. Distribution of Projects Report (With Interest as a lump sum), selection end date 12/23/2016. https://www.faa.gov/sites/faa.gov/files/airports/pfc/monthly_reports/2016/category-interest-lump-sum.pdf

Federal Aviation Administration. 2021. PFC Approved Locations, Collections, and Expiration Dates, as of 9/30/21. https://www.faa.gov/sites/faa.gov/files/airports/pfc/monthly_reports/2021/airports_2.xlsx

Federal Aviation Administration. 2025. PFC Approved Locations, Collections, and Expiration Dates, as of 9/30/2025. https://www.faa.gov/sites/faa.gov/files/2025-09/arp-pfc-monthly-reports-airports-20250930.xlsx

Federal Aviation Administration. 2026a. PFC Approved Locations, Collections, and Expiration Dates, as of 9/30/2026. https://www.faa.gov/sites/faa.gov/files/2026-09/arp-pfc-monthly-reports-airports-20260930.xlsx

Federal Aviation Administration. 2026b. Key Passenger Facility Charge Statistics as of September 30, 2026. https://www.faa.gov/sites/faa.gov/files/2026-09/arp-pfc-monthly-reports-stats-20260930.pdf

Federal Aviation Administration. 2026c. Approved PFC Categories (With Interest as a lump sum), selection end date 9/30/2026. https://www.faa.gov/sites/faa.gov/files/2026-09/arp-pfc-monthly-reports-interest-lump-sum-20260930.pdf

Federal Aviation Administration. 2026d. Approved PFC by Categories (with Interest Spread), selection end date 9/30/2026. https://www.faa.gov/sites/faa.gov/files/2026-09/arp-pfc-monthly-reports-interest-distributed-20260930.pdf

Federal Aviation Administration. 2026e. Calendar Year 2025 Commercial Service Enplanements. https://www.faa.gov/airports/planning_capacity/passenger_allcargo_stats/passenger/arp-cy2025-commercial-service-enplanements.xlsx

Federal Aviation Administration. 2026f. Certification Activity Tracking System, Form 127: Operating and Financial Summary, fiscal year 2025 filings, retrieved 30 September 2026. https://cats.airports.faa.gov/reports/form-127-operating-financial-summary

Federal Aviation Administration. 2026g. Form 127 Glossary. Certification Activity Tracking System. https://cats.airports.faa.gov/reports/form-127-glossary

Government Accountability Office. 2014. Commercial Aviation: Raising Passenger Facility Charges Would Increase Airport Funding, but Other Effects Less Certain. GAO-15-107. https://www.gao.gov/products/gao-15-107

H.R. 3746, Rebuilding America's Airport Infrastructure Act, 119th Cong. (introduced 5 June 2025). https://www.govinfo.gov/app/details/BILLS-119hr3746ih

U.S. Bureau of Labor Statistics. 2026. Consumer Price Index for All Urban Consumers: All Items in U.S. City Average, not seasonally adjusted (CPIAUCNS), retrieved through Federal Reserve Economic Data. https://fred.stlouisfed.org/series/CPIAUCNS

U.S. Government Publishing Office. 2026. Bill Status, H.R. 3746, 119th Congress, bulk data file, retrieved 30 September 2026. https://www.govinfo.gov/bulkdata/BILLSTATUS/119/hr/BILLSTATUS-119hr3746.xml

Wendell H. Ford Aviation Investment and Reform Act for the 21st Century, Pub. L. No. 106-181, 114 Stat. 61 (2000), sec. 105. https://www.govinfo.gov/content/pkg/PLAW-106publ181/pdf/PLAW-106publ181.pdf

Evaluating an airport's capital program or an airport asset?

Valuation Takes Flight reads passenger facility charge records, airport financial filings and rate structures for airport sponsors, lenders, investors and litigation counsel, and supports the opinion of value that follows from them.

Discuss an Engagement

Related service: airport rates and charges study, a review of the fee and rental structure behind the capital program this research describes. For PFC applications, amendments and reporting: airport financial consulting.