Sample FBO RFP Proposal Scoring Matrix

This sample is published online only, at valuationtakesflight.com/services/fbo-rfp/sample-fbo-proposal-scoring-matrix/. It is not distributed as a printed or downloadable document.

For a copy, email Valuationtakesflight@outlook.com.

Valuation Takes Flight LLC · Aeronautical Valuation Advisory

An FBO apron and taxilane seen through an open hangar door
Home / Services / FBO RFP Support / Sample Scoring Matrix
Sample Scoring Matrix

FBO RFP Proposal Scoring Matrix

The evaluation plan for a fixed base operator solicitation, with three proposals scored from offer to recommendation.


Solicitation
Fixed base operator leasehold, Wexley Field
7.5 acres, 25 year term
Prepared for
Wexley Field Airport Authority
Proposals scored
Three
Result
Proposer B ranks first at 88.2 points
Prepared by
Valuation Takes Flight LLC
Dr. Clay W. Carter, DBA, CFA, FRM, CAIA, CIPM
Length
12 sections · 3 addenda · 39 exhibits
SampleThis is an illustrative sample, not the record of any real solicitation. Wexley Field, the Wexley Field Airport Authority, the three proposers and every figure in this document are fictional, assembled to show the format and method a sponsor receives. The criteria, weights and standards are examples, and it is not legal or procurement advice.

Evaluation Summary

Three proposals were received for the fixed base operator leasehold at Wexley Field. All three met the minimum qualifications. Proposer B ranks first at 88.2 points, Proposer A second at 83.8 and Proposer C third at 75.0.

MeasureProposer AProposer BProposer C
Minimum qualificationsPassPassPass
Total present value of the financial offer$8,458,431$8,266,818$8,531,142
Financial return score, of 2524.824.225.0
Non-financial points, of 7559.064.050.0
Total score, of 10083.888.275.0
Rank213
Financial capacity tests met, of four434
Offer conforms to the leasing policyYesNo. Fixed escalationNo. Ground rent and flowage fee below the Schedule

Exhibit 1. Evaluation summary. Illustrative figures for a sample airport.

  1. The financial offers are close. The three present values fall within 3.1 percent of each other, so the 25 financial points separate the proposals by less than one point. The award turns on the other criteria.
  2. The ranking is stable. Proposer B stays first at any weight on financial return below 74.8 points, at discount rates from 5 to 8 percent, under four ways of crediting the reversion, and in each of 10,000 simulated volume paths. No single one-step change in a consensus rating moves it out of first place.
  3. The scoring formula matters more than the weights. A formula that spreads the 25 points between the lowest and highest offer would put Proposer A first. The published formula awards points in proportion to money, and Section 10 shows the difference.
  4. Two offers depart from the leasing policy. Proposer C offered ground rent and a flowage fee below the Schedule. Proposer B offered a fixed escalation in place of the index. Conforming both leaves the ranking unchanged.
  5. The first-ranked proposer misses one capacity standard. Proposer B commits the largest program and its liquidity is below the standard. Section 11 sets the conditions of award that answer it.

1. Purpose of This Document

This is the evaluation plan and scoring matrix for the Wexley Field Airport Authority's request for proposals for a fixed base operator. It is written before proposals arrive, published with the solicitation, and applied without change. The worked example in Sections 7 through 10 scores three proposals to show how the matrix operates.

The matrix tells proposers how they will be judged and gives the Board a record showing that the award followed the published criteria.

How this document is organized

Sections 2 through 6 are the plan: the solicitation, the process, the minimum qualifications, the criteria and the rating scale. Sections 7 through 10 are the worked example. Section 11 gives the recommendation, the conditions of award and the record. Addendum A defines the terms used, Addendum B lists the authorities, and Addendum C indexes the exhibits.

The Authority's leasing policy and Schedule of Rents and Fees govern the solicitation. References to the leasing policy are to the Authority's Leasing Policy and Rents and Fees Policy.

2. The Solicitation

TermDetail
OpportunityFixed base operator leasehold at Wexley Field. The current operating agreement expires June 30, 2028
Premises7.5 acres, 326,700 square feet, with direct ramp and taxiway access
Authority-owned improvementsA 6,800 square foot terminal, a 24,000 square foot community hangar, and the fuel farm
Required servicesJet A and 100LL fueling, line service, aircraft parking and tiedown, hangar storage, and passenger and crew facilities, at the hours set in the minimum standards
Required investmentA new hangar of at least 30,000 square feet, complete within 36 months of commencement
Term25 years, under the term schedule in the Authority's leasing policy
ReversionAll improvements become the property of the Authority at expiration
Financial offerEach proposer states ground rent, facility rent, fuel flowage fee, any percentage of gross revenue, the escalation method, and any minimum annual guarantee

Exhibit 2. Summary of the solicitation. Illustrative figures for a sample airport.

Nothing in the solicitation grants an exclusive right, which Grant Assurance 23 prohibits. Grant Assurance 22 requires that the terms offered be reasonable and not unjustly discriminatory.

The federal frame

Wexley Field is federally obligated, so the solicitation is written inside the grant assurances. The table lists the provisions that shape it.

AuthorityWhat it means for this solicitation
Grant Assurance 22, Economic NondiscriminationThe terms offered must be reasonable and not unjustly discriminatory. Rates are uniform among fixed base operators making the same or similar use of the same or similar facilities
Grant Assurance 22(f)A based aircraft operator may fuel and service its own aircraft with its own employees. The award does not make the successful proposer the only source of fuel
Grant Assurance 23, Exclusive RightsThe award grants no exclusive right. Another operator that meets the minimum standards may apply for property on the airport
Grant Assurance 24, Fee and Rental StructureThe financial terms should make the airport as self-sustaining as possible. Financial return is scored for that reason
FAA Order 5190.6C, paragraph 8.8.bA competitive offering does not relieve the sponsor of its obligation to give access on reasonable terms, without unjust discrimination and without an exclusive right
FAA Order 5190.6C, paragraph 12.3.b(3)A term should not exceed the period reasonably needed to amortize the investment. Terms of 30 to 35 years are generally sufficient for major facilities
FAA Order 5190.6C, paragraphs 12.3.b(4) and 9.5.eA lease of more than five years should adjust rent periodically, by a recognized index or by appraisal
FAA Order 5190.6C, paragraph 12.3.b(5)The FAA asks whether title to tenant facilities vests in the sponsor at expiration. Here it does, and the financial score credits it
Advisory Circular 150/5190-8Federal guidance on minimum standards for commercial aeronautical activities, which the required services follow

Exhibit 3. Federal authorities that bear on the solicitation. Summaries, not legal advice.

Why the term is 25 years

The leasing policy sets a ground lease term from the lessee's investment per square foot of the area it develops, and it states one term for all proposers in a solicitation (clauses 8.1, 8.5 and 8.8). The Authority set the term before any proposal arrived, from the minimum a proposer is required to build.

MeasureAmount
Required hangarAt least 30,000 square feet
Engineer's estimate for the required hangar, at $165 per square foot$4,950,000
Development area on the solicitation's site plan3.0 acres, 130,680 square feet
Required investment per square foot of development area$37.88
Tier of the term schedule metAt least $30, for a term of up to 25 years
Investment proposed per square foot of development areaProposer A $49.74, Proposer B $68.87, Proposer C $38.26

Exhibit 4. Support for the 25 year term under the term schedule in the leasing policy. Illustrative figures for a sample airport.

The terminal, the community hangar, the fuel farm and the existing ramp are Authority-owned and are left out of the measure. Proposer B's program would meet the $50 tier, which carries 30 years. The term stays at 25 years for all three so that the offers can be compared, and the larger program is scored under capital investment.

Where the volume assumptions come from

Fiscal year ended June 30Fuel delivered, gallonsNon-fuel gross revenue
20221,036,400$1,212,000
20231,061,900$1,259,000
20241,093,200$1,306,000
20251,121,500$1,352,000
20261,148,600$1,398,500

Exhibit 5. Fuel deliveries and non-fuel gross revenue of the fixed base operation, from the Authority's flowage reports and the operator's certified statements. Illustrative figures for a sample airport.

Year 1 is held at the level of the last complete fiscal year, rounded: 1,150,000 gallons and $1,400,000. Growth is set at 2.0 percent for fuel and 2.5 percent for non-fuel revenue, below the five year averages of 2.6 percent and 3.6 percent. No offer is scored on growth the airport has not already shown.

Terms the leasing policy sets

Three terms are not open to offer. The Schedule of Rents and Fees is the floor for ground rent, at $0.45 per square foot, and for the fuel flowage fee, at $0.12 per gallon (clause 6.8 of the leasing policy). Rent adjusts by the Consumer Price Index each year and resets to the Schedule every fifth year (Section 10). All improvements pass to the Authority at expiration.

An offer that departs from one of these terms is scored as submitted, so that the evaluator changes no proposer's numbers. The departure is flagged in Section 7. Before award it is conformed in negotiation, or the Board approves it as an exception with written findings.

3. Evaluation Process

  1. Responsiveness review. Staff confirm each proposal is complete and on time.
  2. Minimum qualifications. Each proposal is tested pass or fail against Section 4. A proposal that fails any item is not scored.
  3. Individual scoring. Each evaluation committee member scores the non-financial criteria alone, in writing, using the rating scale in Section 6.
  4. Financial scoring. The Authority's financial consultant computes the financial return score by the formula in Section 7. The committee does not adjust it.
  5. Consensus meeting. The committee meets, discusses differences, and records one consensus rating per criterion with a written reason.
  6. Interviews. The two highest scoring proposers are interviewed. Ratings may be revised once, with reasons recorded.
  7. Recommendation. The committee sends the Board a ranked recommendation with the completed matrix.

Committee members disclose any financial or personal interest in a proposer before receiving proposals. A member with a conflict is replaced.

Calendar

StepTimingWho
Solicitation and this document publishedWeek 0Procurement officer
Pre-proposal conference and site tourWeek 3Staff
Written questions dueWeek 5Proposers
Answers issued to all proposers by addendumWeek 7Procurement officer
Proposals dueWeek 13Proposers
Responsiveness review and minimum qualificationsWeeks 13 to 14Staff
Individual scoring and the financial computationWeeks 14 to 17Committee members and the financial consultant
Consensus meetingWeek 18Committee
InterviewsWeek 20Committee
Recommendation to the BoardWeek 22Committee
Negotiation and agreementWeeks 22 to 34Staff and counsel
Transition to the new agreementFrom signing to June 30, 2028Staff and both operators

Exhibit 6. Evaluation calendar. Sample schedule.

Who does what

RoleDoesDoes not
Procurement officerRuns the process, is the single point of contact for proposers, and keeps the recordScore
Evaluation committee, five membersScores the non-financial criteria, sets the consensus ratings and makes the recommendationChange the criteria, weights or formula
Financial consultantComputes the financial return score and the financial capacity testsRate the other criteria
CounselAdvises on procedure and drafts the agreementScore
BoardReceives the recommendation and decidesScore proposals again

Exhibit 7. Roles in the evaluation. Sample provisions.

Rules that protect the record

  1. One point of contact. From publication to award, proposers communicate only with the procurement officer.
  2. The same information to all. Every answer to a question goes to every proposer in a written addendum.
  3. Nothing changes after publication. The criteria, weights, rating scale, volume assumptions, discount rate, reversion method and formula are fixed when the solicitation is published.
  4. Service before money. Members complete their individual ratings of the non-financial criteria before they see the financial return score.
  5. A reason for every rating. Each rating, individual and consensus, is recorded with the fact in the proposal that supports it.

4. Minimum Qualifications

RequirementStandardEvidence
Operating experienceFive years operating a full service FBO at an airport with jet trafficList of locations, dates and sponsor references
Minimum standardsCommitment to meet the Authority's minimum standards for an FBO in fullSigned statement
Financial statementsThree years of audited or reviewed statementsStatements attached
InsuranceAbility to carry the coverage in the minimum standardsBroker letter
No defaultNo uncured default on an airport agreement in the last five yearsSigned statement and references
Required investmentCommitment to the 30,000 square foot hangar within 36 monthsDevelopment plan and schedule

Exhibit 8. Minimum qualifications, scored pass or fail. Sample standards.

Results

RequirementProposer AProposer BProposer C
Operating experiencePass. 11 years, six locationsPass. 22 years, fourteen locationsPass. 8 years, two locations
Minimum standardsPassPassPass
Financial statementsPass. AuditedPass. AuditedPass. Reviewed
InsurancePassPassPass
No defaultPassPassPass
Required investmentPass. 36,000 square feet by month 30Pass. 42,000 square feet by month 36Pass. 30,000 square feet by month 24
ResultScoredScoredScored

Exhibit 9. Minimum qualification results. Illustrative figures for a sample airport.

Pass or fail items are kept apart from the scored criteria so that a proposer is not rewarded twice for one fact. Meeting the five year minimum earns no points. Experience beyond it is scored in Section 5.

5. Scored Criteria and Weights

CriterionWeight
Experience and qualifications20
Operating plan and service levels20
Capital investment and development plan15
Financial return to the airport25
Financial capacity10
Transition and staffing plan5
Pricing commitments to users5
Total100

Exhibit 10. Scored criteria and weights. Sample weights. A sponsor sets its own.

What each criterion measures

  1. Experience and qualifications. Record at comparable airports, tenure of the proposed general manager, safety record, and sponsor references.
  2. Operating plan and service levels. Hours, staffing, fueling equipment, training program, and customer service standards.
  3. Capital investment and development plan. Amount, design, schedule, and fit with the airport layout plan.
  4. Financial return to the airport. The present value of all payments and the reversion, computed in Section 7.
  5. Financial capacity. Liquidity, leverage, debt service coverage and committed financing, tested in Section 8.
  6. Transition and staffing plan. Continuity of service at changeover and the approach to existing employees.
  7. Pricing commitments to users. Posted fuel pricing, based tenant programs, and any commitments on hangar and tiedown rates.

Sub-factors and evidence

CriterionSub-factorsEvidence the committee reads
Experience and qualificationsNumber and size of locations operated, tenure of the proposed general manager, safety record, referencesLocation list, resumes, audit and incident history, calls to sponsor references
Operating plan and service levelsHours, staffing by shift, fueling equipment, training, customer service standardsOperating plan, staffing chart, equipment list, training program
Capital investment and development planAmount, hangar size and design, schedule, fit with the airport layout planSite plan, cost estimate, construction schedule
Financial return to the airportPresent value of payments and the reversionFinancial offer form, computed by the formula in Section 7
Financial capacityLiquidity, leverage, debt service coverage, committed financingFinancial statements and commitment letters, tested in Section 8
Transition and staffing planContinuity of fuel and line service at changeover, approach to existing employeesTransition plan and timeline
Pricing commitments to usersPosted fuel pricing, programs for based tenants, commitments on hangar and tiedown ratesPricing statement and sample rate sheet

Exhibit 11. Sub-factors and evidence for each scored criterion. Sample provisions.

How the weights were set

Fifty of the 100 points go to how the operation will be run: experience, the operating plan, transition and pricing. Fifteen go to what will be built. Thirty-five go to money and the strength behind it: financial return and financial capacity. The split reflects what this Authority asked for, a full service operator at an airport with 186 based aircraft, 39 of them turbine. A sponsor that needs revenue more than service weights differently. It sets the weights before it sees a proposal, and Section 10 tests how far they would have to move to change the result.

6. Rating Scale

RatingMeaningShare of the criterion's weight
5Exceeds the requirement in ways that benefit the airport, with evidence100 percent
4Meets the requirement fully, with some added benefit80 percent
3Meets the requirement60 percent
2Meets the requirement in part, with gaps that can be cured40 percent
1Significant gaps20 percent
0Not addressed0 percent

Exhibit 12. Rating scale for the non-financial criteria. Sample scale.

Points for a criterion equal its weight times the rating divided by five. A rating of 4 on a 20 point criterion earns 16 points.

What a rating looks like

Each criterion has written anchors so that a 4 means the same thing to every member. The anchors for experience and qualifications are shown as an example.

RatingExperience and qualifications
5Operates full service FBOs at several airports of the same size or larger. The proposed general manager has run a comparable location. References confirm the record without reservation
4Operates more than one comparable location, with a general manager experienced at this scale. References are positive
3Meets the five year requirement at smaller fields or at one comparable location. References are satisfactory
2Meets the requirement, with gaps in management depth or in the references
1Experience at this scale is asserted and not shown

Exhibit 13. Rating anchors for one criterion. Sample provisions.

From individual ratings to consensus

CriterionProposer AProposer BProposer C
Experience and qualifications4, 4, 4, 5, 4. Consensus 45, 5, 5, 4, 5. Consensus 53, 3, 2, 3, 3. Consensus 3
Operating plan and service levels4, 4, 3, 4, 4. Consensus 44, 4, 5, 4, 4. Consensus 43, 3, 3, 4, 3. Consensus 3
Capital investment and development plan4, 4, 4, 4, 3. Consensus 45, 5, 4, 5, 5. Consensus 53, 3, 3, 3, 3. Consensus 3
Financial capacity4, 4, 4, 4, 4. Consensus 43, 3, 3, 3, 4. Consensus 35, 5, 5, 5, 5. Consensus 5
Transition and staffing plan4, 4, 5, 4, 4. Consensus 43, 3, 2, 3, 3. Consensus 34, 4, 4, 3, 4. Consensus 4
Pricing commitments to users3, 3, 3, 4, 3. Consensus 34, 4, 4, 3, 4. Consensus 43, 3, 3, 3, 2. Consensus 3

Exhibit 14. The five members' individual ratings and the consensus rating for each non-financial criterion. Illustrative figures for a sample airport.

Consensus is reached by discussion and recorded with a reason. It is not an average. In this example no two members differed by more than one step on any rating. Where members differ by two steps or more, the members at each end explain their ratings before the committee settles one. Proposers A and B were interviewed, and the committee confirmed its ratings without change.

7. Financial Return: Putting the Offers on One Basis

Financial offers are structured differently. One proposer bids a high ground rent, another a high flowage fee, a third a percentage of revenue with a guarantee. The headline numbers cannot be compared until they are converted to one figure.

The method

  1. Every offer is applied to the same volume assumptions, set by the Authority and published in the solicitation: 1,150,000 gallons of fuel in year 1 growing 2.0 percent a year, and non-fuel gross revenue of $1,400,000 growing 2.5 percent a year. Proposers' own forecasts are not used, so a proposer gains nothing from an optimistic forecast.
  2. Payments are projected for each of the 25 years, using the escalation method the proposer offered. Where a minimum annual guarantee exceeds the computed payment, the guarantee is used.
  3. The improvements revert to the Authority at year 25. The reversion is credited at the capital investment less straight line depreciation over a 40 year life, with no escalation.
  4. Payments and the reversion are discounted to present value at 6.50 percent.
  5. The highest present value earns all 25 points. Each other proposal earns 25 points times its present value divided by the highest.

The three offers

Offer termProposer AProposer BProposer C
Ground rent per SF per year$0.45$0.50$0.42
Facility rent per year$210,000$180,000$240,000
Fuel flowage fee per gallon$0.12$0.15$0.10
Percentage of non-fuel gross revenue2.0 percentNone3.0 percent
Escalation of rentsCPI, taken at 2.5 percentFixed 2.0 percentCPI capped at 3.0 percent, taken at 2.5 percent
Minimum annual guarantee$450,000None$500,000
Capital investment$6,500,000$9,000,000$5,000,000
Hangar complete byMonth 30Month 36Month 24

Exhibit 15. Financial offers as submitted. Illustrative figures for a sample airport.

Year 1 payments on the Authority's volume assumptions

PaymentProposer AProposer BProposer C
Ground rent$147,015$163,350$137,214
Facility rent$210,000$180,000$240,000
Fuel flowage fees$138,000$172,500$115,000
Percentage of non-fuel revenue$28,000$0$42,000
Total year 1 payment$523,015$515,850$534,214

Exhibit 16. Year 1 payments to the Authority. Illustrative figures for a sample airport.

Present value and score

ComponentProposer AProposer BProposer C
Present value of payments, 25 years$7,953,532$7,567,727$8,142,758
Value of improvements at reversion, year 25$2,437,500$3,375,000$1,875,000
Present value of the reversion$504,899$699,091$388,384
Total present value$8,458,431$8,266,818$8,531,142
Financial return score, of 2524.824.225.0

Exhibit 17. Present value of each offer at 6.50 percent, and the resulting score. Illustrative figures for a sample airport.

Proposer B offers the highest ground rent and the highest flowage fee, and its total present value is the lowest of the three, because it offers no percentage rent and the lowest facility rent. Proposer C offers the lowest ground rent and flowage fee and ranks first. The three offers land within 3.1 percent of each other. On this solicitation the financial offers are close, and the other criteria will decide the award.

Downside test

Year 1, volumes 30 percent lowerProposer AProposer BProposer C
Computed payment$473,215$464,100$487,114
Minimum annual guarantee$450,000None$500,000
Payment received$473,215$464,100$500,000

Exhibit 18. Year 1 payments if fuel volume and non-fuel revenue are 30 percent below the Authority's assumptions. Illustrative figures for a sample airport.

The guarantees do not bind on the Authority's assumptions. In the downside case Proposer C's guarantee sets the payment. Proposer B, with no guarantee and the heaviest reliance on flowage, falls furthest. The committee may weigh this under financial capacity. It does not change the formula score.

Payments by year

Lease yearProposer AProposer BProposer C
Year 1$523,015$515,850$534,214
Year 5$574,360$558,373$587,214
Year 10$645,754$616,489$660,976
Year 15$726,104$680,653$744,078
Year 20$816,544$751,496$837,710
Year 25$918,351$829,712$943,214
Total, 25 years$17,571,433$16,522,830$18,002,897

Exhibit 19. Payments to the Authority in selected years, on the Authority's volume assumptions. Illustrative figures for a sample airport.

Line chart of annual payments to the Authority over the 25 year term for Proposers A, B and C, with Proposer C highest and Proposer B lowest in every year
Exhibit 20. Annual payments to the Authority over the term. Illustrative figures for a sample airport.

Proposer C pays the largest amount in every year and Proposer B the smallest. Proposer B's rents rise at a fixed 2.0 percent while the others follow the index at 2.5 percent, so the gap widens: Proposer B is $7,165 below Proposer A in year 1 and $88,639 below in year 25. No guarantee sets a payment in any year on the Authority's assumptions.

Where the present value comes from

ComponentProposer AProposer BProposer C
Ground rent$2,263,949$2,396,410$2,113,019
Facility rent$3,233,883$2,640,673$3,695,866
Fuel flowage fees$2,024,516$2,530,645$1,687,096
Percentage of non-fuel revenue$431,184$0$646,777
Reversion of improvements$504,899$699,091$388,384
Total present value$8,458,431$8,266,818$8,531,142
Share from fuel flowage23.9 percent30.6 percent19.8 percent

Exhibit 21. Present value of each offer by component, at 6.50 percent. Illustrative figures for a sample airport.

Facility rent is the largest component of every offer. Proposer B draws 30.6 percent of its value from flowage, against 19.8 percent for Proposer C, so Proposer B's payments depend more on fuel volume. Proposer C draws more from fixed rent and from the percentage of non-fuel revenue.

If volumes differ from the assumptions

The downside test above lowers volumes by 30 percent. Two further tests ask how different volumes would have to be to change the financial ranking, and how the offers behave when volumes vary from year to year.

Proposer A's offer would pass Proposer C's only if fuel and non-fuel volumes ran at 1.60 times the Authority's assumptions in every year. Proposer B's would pass Proposer C's at 2.34 times. Fuel deliveries grew 2.6 percent a year over the last five years, so neither level is within what the record supports.

We then drew 10,000 volume paths. Each year's growth in fuel gallons and in non-fuel revenue varies around the Authority's assumption, with a standard deviation of 5 percent for fuel and 4 percent for non-fuel revenue and a correlation of 0.5 between them. The index is held at 2.5 percent.

Result of 10,000 pathsProposer AProposer BProposer C
Mean total present value$8,455,682$8,264,164$8,528,433
5th percentile$8,057,747$7,812,254$8,170,546
95th percentile$8,922,204$8,792,704$8,952,042
Share of paths ranked first on financial return2.7 percent0.1 percent97.2 percent
Share of paths in which the guarantee sets a payment0.0 percentNo guarantee0.0 percent
Share of paths ranked first overall0.0 percent100.0 percent0.0 percent

Exhibit 22. Simulation of fuel and non-fuel volumes over the term. The standard deviations and the correlation are assumptions. Illustrative figures for a sample airport.

Range chart of the total present value of each offer across 10,000 simulated volume paths, showing the 5th to 95th percentile and the median for Proposers A, B and C
Exhibit 23. Range of total present value across the simulated paths. Illustrative figures for a sample airport.

Proposer C ranks first on financial return in 97.2 percent of the paths and Proposer B ranks last in 99.6 percent. The ranges overlap because all three offers rise and fall with the same volumes. What matters for the award is that Proposer B remains first overall in every path.

The simulation also shows what the guarantees are worth. Neither one sets a payment in any path. A flat guarantee loses force as rent escalates: the fixed rents in Proposer A's offer pass its $450,000 guarantee in year 11, and those in Proposer C's pass $500,000 in year 13. A guarantee protects the Authority through the term only if it escalates with rent.

The reversion credit

The formula credits the hangar that passes to the Authority at year 25. The published method takes the capital investment less straight line depreciation over 40 years. It is one of several defensible methods, and the choice matters because the three programs differ in size.

Reversion methodProposer AProposer BProposer CFinancial rankingOverall ranking
Straight line over 40 years, no escalation, as published$8,458,431$8,266,818$8,531,142C, A, BB, A, C
No credit for the reversion$7,953,532$7,567,727$8,142,758C, A, BB, A, C
Straight line over 50 years$8,626,731$8,499,848$8,660,603C, A, BB, A, C
Cost escalated 2.5 percent a year, then straight line over 40 years$8,889,586$8,863,803$8,862,800A, B, CB, A, C

Exhibit 24. Total present value under four methods of crediting the reversion. Illustrative figures for a sample airport.

With no credit, Proposer B falls further behind on financial return. With cost escalated to year 25, the three offers land within 0.30 percent of each other and Proposer A ranks first on financial return. The overall ranking is B, A, C under all four. Because the method can reorder the financial ranking, it is fixed and published before proposals arrive.

Offers against the leasing policy

TermLeasing policyProposer AProposer BProposer C
Ground rent per square footSchedule rate of $0.45 is the minimum$0.45. Conforms$0.50. Conforms$0.42. Below the Schedule
Fuel flowage fee per gallonSchedule rate of $0.12 is the minimum$0.12. Conforms$0.15. Conforms$0.10. Below the Schedule
Escalation of rentIndex each year, capped at 4 percent, with a reset every fifth yearIndex. ConformsFixed 2.0 percent. DiffersIndex capped at 3.0 percent. Differs
Term25 years, set in the solicitationConformsConformsConforms

Exhibit 25. The three offers against the terms the leasing policy sets. Illustrative figures for a sample airport.

We then conformed the offers and scored them again: Proposer C at the Schedule rates for ground rent and flowage, and Proposer B on the index in place of its fixed 2.0 percent. Proposer C's cap of 3.0 percent does not bind at an index of 2.5 percent.

MeasureProposer AProposer BProposer C
Total present value as submitted$8,458,431$8,266,818$8,531,142
Total present value conformed$8,458,431$8,517,134$9,019,491
Financial return score conformed, of 2523.423.625.0
Total score conformed82.487.675.0
Rank conformed213

Exhibit 26. The offers conformed to the leasing policy and scored again. Illustrative figures for a sample airport.

Conforming raises Proposer C's present value by $488,349 and Proposer B's by $250,316. The ranking is unchanged. An award at a rate below the Schedule would need a Board resolution with written findings under clause 29.2 of the leasing policy. That question arises only if the Authority reaches Proposer C.

8. Financial Capacity

TestStandardProposer AProposer BProposer C
LiquidityCash and committed credit of at least 6 months of operating expenses9 months5 months14 months
Leverage after the projectDebt to EBITDA of 4.0 or less3.13.81.9
Debt service coverage1.25 or more on the Authority's volume assumptions1.421.271.80
Committed financingCommitment letter for at least 60 percent of the capital investment70 percent60 percent100 percent
Rating435

Exhibit 27. Financial capacity tests and ratings. Sample standards and illustrative figures.

Proposer B commits more capital than the others and has less capacity to carry it: liquidity below the standard and coverage close to the floor. The rating reflects that, and the committee records the reason with it.

How each test is computed

TestComputationSource
LiquidityUnrestricted cash plus undrawn committed credit, divided by average monthly operating expenses in the last fiscal yearFinancial statements and lender letters
Leverage after the projectTotal debt, including the debt for this project, divided by EBITDA for the last fiscal yearFinancial statements and the financing plan
Debt service coverageEBITDA of the Wexley Field operation after rent and fees, on the Authority's volume assumptions, divided by annual principal and interest on the project debtThe proposer's pro forma, restated to the Authority's volumes
Committed financingSigned lender commitments and documented equity, as a share of the capital investmentCommitment letters and bank statements

Exhibit 28. How each financial capacity test is computed. Sample provisions.

From tests to a rating

  1. 5. Exceeds all four standards by a clear margin.
  2. 4. Meets all four standards.
  3. 3. Misses one standard by a margin that a condition of award can cure.
  4. 2. Misses two standards.
  5. 1. Misses three or more, or has no committed financing.

Capacity is scored apart from capital investment on purpose. Proposer B earns a 5 for the size of its program and a 3 for its ability to carry it. A matrix that scored only the commitment would reward the risk along with the hangar.

9. The Completed Matrix

CriterionWeightProposer AProposer BProposer C
Experience and qualifications2016.020.012.0
Operating plan and service levels2016.016.012.0
Capital investment and development plan1512.015.09.0
Financial return to the airport2524.824.225.0
Financial capacity108.06.010.0
Transition and staffing plan54.03.04.0
Pricing commitments to users53.04.03.0
Total score10083.888.275.0
Rank213

Exhibit 29. Completed scoring matrix after the consensus meeting. Illustrative figures for a sample airport.

CriterionProposer AProposer BProposer C
Experience and qualifications4. Six FBOs, two at comparable fields5. Fourteen FBOs, strong sponsor references3. Two FBOs, both smaller fields
Operating plan and service levels4. Exceeds required hours4. Exceeds required hours3. Meets required hours
Capital investment and development plan4. $6.5 million, month 305. $9.0 million, 42,000 SF hangar3. $5.0 million, minimum program
Financial capacity4. Meets all four tests3. Liquidity below standard5. Exceeds all four tests
Transition and staffing plan4. Offers to retain line staff3. General commitments only4. Offers to retain line staff
Pricing commitments to users3. Posted pricing4. Posted pricing and a based tenant program3. Posted pricing

Exhibit 30. Consensus ratings and the recorded reasons. Illustrative figures for a sample airport.

Bar chart of the points each proposer earned on each of the seven criteria, with the weight of each criterion shown beside its name
Exhibit 31. Points earned by criterion. The weight of each criterion is in parentheses. Illustrative figures for a sample airport.

What separates the first two proposals

CriterionProposer BProposer AB less A
Experience and qualifications20.016.04.0
Operating plan and service levels16.016.00.0
Capital investment and development plan15.012.03.0
Financial return to the airport24.224.8(0.6)
Financial capacity6.08.0(2.0)
Transition and staffing plan3.04.0(1.0)
Pricing commitments to users4.03.01.0
Total88.283.84.4

Exhibit 32. Where the margin between Proposer B and Proposer A comes from. Illustrative figures for a sample airport.

Proposer B leads by 4.4 points. It gains 8.0 points on experience, capital investment and pricing, and gives back 3.6 on financial return, financial capacity and transition. The lead rests on experience and on the size of the hangar program, the two things the committee can verify from references and from the development plan.

10. Sensitivity of the Ranking

The ranking should not depend on a small change in a weight or in the discount rate. We test both.

Weight on financial returnProposer AProposer BProposer CRanking
15 points81.787.171.7B, A, C
25 points83.888.275.0B, A, C
35 points85.889.478.3B, A, C

Exhibit 33. Total scores with the financial weight moved and the other weights scaled in proportion. Illustrative figures for a sample airport.

Discount rateProposer AProposer BProposer CFinancial ranking
5.00 percent$10,060,372$9,861,091$10,118,065C, A, B
6.50 percent$8,458,431$8,266,818$8,531,142C, A, B
8.00 percent$7,210,171$7,030,712$7,290,006C, A, B

Exhibit 34. Total present value at three discount rates. Illustrative figures for a sample airport.

The overall ranking is B, A, C at every weight tested. The financial ranking is C, A, B at every rate tested. Neither result depends on a single assumption.

How far the financial weight must move

Weight on financial returnProposer AProposer BProposer CRanking
25 points83.888.275.0B, A, C
40 points86.990.080.0B, A, C
60 points91.092.386.7B, A, C
70 points93.093.490.0B, A, C
80 points95.194.693.3A, B, C

Exhibit 35. Total scores as the financial weight rises and the other weights are scaled in proportion. Illustrative figures for a sample airport.

Proposer A passes Proposer B only when financial return carries more than 74.8 of the 100 points. The published weight is 25, a third of that level. The result does not depend on the weight chosen.

The scoring formula

The published formula gives each proposal 25 points times its present value divided by the highest. Another formula in common use gives the highest offer 25 points, the lowest none, and spreads the others between them. The two treat the same offers differently when the offers are close.

FormulaProposer AProposer BProposer CRanking
Published: in proportion to present value. Financial score24.824.225.0
Published: total score83.888.275.0B, A, C
Spread between lowest and highest. Financial score18.10.025.0
Spread between lowest and highest. Total score77.164.075.0A, C, B

Exhibit 36. The same three offers under two financial scoring formulas. Illustrative figures for a sample airport.

Under the spread formula a difference of 3.1 percent in present value becomes a difference of 25 points, and Proposer A moves to first. The offers did not change. The formula turned a small difference in money into the largest difference in the matrix. The proportional formula is published in the solicitation for that reason, and it is the one applied.

One rating at a time

We changed each consensus rating by one step, up and down, one at a time: 33 tests. Proposer B stays first in all of them. The closest cases raise one of Proposer A's ratings on a 20 point criterion from 4 to 5, which leaves Proposer A at 87.8 and Proposer B at 88.2. It takes two changes to alter the result.

Summary of the tests

TestRange testedOverall ranking
Weight on financial return15 to 35 points, and upward until the result changesB, A, C up to 74.8 points
Discount rate5.00, 6.50 and 8.00 percentB, A, C at each rate
Volumes 30 percent lower in every yearWith each guarantee appliedB, A, C
Volumes 30 percent higher in every yearWith each guarantee appliedB, A, C
Simulated volume paths10,000 pathsB first in every path
Reversion methodFour methodsB, A, C under each
Offers conformed to the leasing policySchedule floor and index escalationB, A, C
One-step change in a consensus rating33 testsB first in each
Financial scoring formulaProportional and spreadB, A, C proportional. A, C, B spread

Exhibit 37. Tests of the ranking and their results. Illustrative figures for a sample airport.

One test changes the result, and it is a change of method that the published plan excludes. Every test of an assumption inside the plan leaves Proposer B first.

11. Recommendation and Record

Proposer B ranks first at 88.2 points
Proposer A 83.8 · Proposer C 75.0

The committee recommends that the Board authorize negotiation with Proposer B. Because Proposer B's liquidity is below the standard, the committee recommends that the agreement require a completion guarantee or a letter of credit for the hangar, and a minimum annual guarantee, as conditions of award.

The record sent to the Board holds the published evaluation plan, each member's individual score sheets, the consensus matrix with reasons, the financial consultant's computation, the sensitivity tests, and the conflict disclosures. That record supports the award if it is challenged.

Conditions of award

ConditionReasonRisk addressed
A completion guarantee or a letter of credit for the hangarProposer B's liquidity is 5 months against a standard of 6, and its program is the largest of the threeConstruction
A minimum annual guarantee that escalates with rentProposer B offered none and draws the largest share of its payments from fuel flowageVolume
Rent escalation by the index, with the five year resetProposer B offered a fixed 2.0 percent, and the leasing policy sets the adjustmentPolicy conformance
The 42,000 square foot hangar complete by month 36, as proposedPoints were awarded for the program and the dateDelivery
Annual certified statements of gallons and gross revenue, with audit rightsFlowage fees depend on reported volumesReporting
The proposal attached to the agreement as an exhibitService levels, staffing and pricing commitments earned pointsPerformance

Exhibit 38. Recommended conditions of award. Sample provisions.

If negotiation does not conclude

The committee recommends that the Board authorize negotiation with Proposer A, the second-ranked proposer, if agreement with Proposer B is not reached within 90 days. Proposer A's offer conforms to the leasing policy as submitted. Proposer C's would have to be brought to the Schedule rates, or approved as an exception, before an award.

After the award

What is checkedWhenAgainst
Construction milestonesEach quarter until completionThe schedule in the proposal
Cost of the improvementsWithin 120 days after completionThe capital investment proposed, certified with invoices under clause 8.6 of the leasing policy
PaymentsEach month and each yearThe financial offer and the flowage reports
Service levelsEach yearHours, staffing and equipment in the operating plan
Pricing commitmentsEach yearThe pricing statement in the proposal
Financial conditionEach yearThe four capacity standards in Section 8
RentEvery fifth yearThe Schedule in effect after the rent study

Exhibit 39. Monitoring after the award. Sample provisions.

Points were awarded for commitments. The agreement is what makes them enforceable, and the monitoring schedule is how the Authority finds out whether they were kept.

12. About Valuation Takes Flight

Valuation Takes Flight LLC is an aviation valuation and advisory firm led by Dr. Clay W. Carter, DBA, CFA, FRM, CAIA, CIPM. The firm supports airport sponsors on FBO solicitations: the business terms of the RFP, the financial scoring of proposals, and the lease economics behind the negotiation. On any one solicitation the firm works for the sponsor only.

Procurement procedure and the agreement itself stay with the sponsor's procurement staff and counsel. This document is not legal advice.

Addendum A. Terms Used

TermMeaning in this document
Consensus ratingThe single rating the committee records for a criterion after discussion, with its reason
Debt service coverageCash flow available to pay debt, divided by the principal and interest due in the year
Discount rateThe annual rate used to convert future payments to present value. The Authority uses 6.50 percent
EBITDAEarnings before interest, taxes, depreciation and amortization
Fixed base operatorA commercial operator that sells fuel and provides line service, aircraft parking, hangar storage and passenger facilities to the public
Fuel flowage feeA fee paid to the airport for each gallon of fuel delivered
Minimum annual guaranteeA floor on the total paid to the airport in a year, whatever the volumes
Minimum standardsThe Authority's published qualifications for commercial operators
Percentage rentA payment equal to a stated share of gross revenue
Present valueThe value today of a stream of future payments, discounted at the discount rate
ResponsivenessWhether a proposal is complete and on time. It is reviewed before anything is scored
ReversionThe passing of the lessee's improvements to the airport when the agreement ends
ScheduleThe Authority's Schedule of Rents and Fees
Volume assumptionsThe fuel gallons and non-fuel revenue the Authority publishes and applies to every offer

Addendum B. Authorities and Sources

Paragraph references are to the edition and date shown. Summaries in this document are the firm's and are not legal advice.

  1. Federal Aviation Administration. Airport Sponsor Assurances (April 2025): Assurances 22, 23 and 24. faa.gov
  2. Federal Aviation Administration. Order 5190.6C, Airport Compliance Manual, effective February 20, 2026: paragraphs 8.8.b, 9.5.e and 12.3.b, and chapter 11 on self-service. See what Order 5190.6C changes.
  3. Federal Aviation Administration. Advisory Circular 150/5190-8, Minimum Standards for Commercial Aeronautical Activities (December 7, 2023). faa.gov
  4. Wexley Field Airport Authority. Leasing Policy and Rents and Fees Policy, effective July 1, 2026. A sample document.
  5. Valuation Takes Flight LLC. How fixed base operators are valued, and the sample FBO valuation report.

Addendum C. Index of Exhibits

1Evaluation summary2Summary of the solicitation3Federal authorities that bear on the solicitation4Support for the 25 year term under the term schedule in the leasing policy5Fuel deliveries and non-fuel gross revenue of the fixed base operation, from the Authority's flowage reports and the operator's certified statements6Evaluation calendar7Roles in the evaluation8Minimum qualifications, scored pass or fail9Minimum qualification results10Scored criteria and weights11Sub-factors and evidence for each scored criterion12Rating scale for the non-financial criteria13Rating anchors for one criterion14The five members' individual ratings and the consensus rating for each non-financial criterion15Financial offers as submitted16Year 1 payments to the Authority17Present value of each offer at 6.50 percent, and the resulting score18Year 1 payments if fuel volume and non-fuel revenue are 30 percent below the Authority's assumptions19Payments to the Authority in selected years, on the Authority's volume assumptions20Annual payments over the term, charted21Present value of each offer by component, at 6.50 percent22Simulation of fuel and non-fuel volumes over the term. The standard deviations and the correlation are assumptions23Range of total present value in the simulation, charted24Total present value under four methods of crediting the reversion25The three offers against the terms the leasing policy sets26The offers conformed to the leasing policy and scored again27Financial capacity tests and ratings28How each financial capacity test is computed29Completed scoring matrix after the consensus meeting30Consensus ratings and the recorded reasons31Points earned by criterion, charted32Where the margin between Proposer B and Proposer A comes from33Total scores with the financial weight moved and the other weights scaled in proportion34Total present value at three discount rates35Total scores as the financial weight rises and the other weights are scaled in proportion36The same three offers under two financial scoring formulas37Tests of the ranking and their results38Recommended conditions of award39Monitoring after the award

Putting an FBO leasehold out to proposal?

Send the draft solicitation or a short note on the leasehold, and we will reply with a scope and a fee quote. If you would like a copy of this sample, ask and we will send one.

Discuss an Engagement

Valuationtakesflight@outlook.com

Questions about scoring FBO proposals

How should an airport score FBO proposals?

Against criteria and weights published with the request for proposals and applied without change. This sample uses seven criteria totaling 100 points, a zero to five rating scale for the non-financial criteria, and a formula for financial return so that the committee cannot adjust it.

How do you compare FBO financial offers that are structured differently?

Convert each one to a present value on the same volume assumptions. In this sample the three offers differ in ground rent, facility rent, flowage fee, percentage rent and guarantee, and their present values are $8,458,431, $8,266,818 and $8,531,142. The proposer with the highest ground rent and flowage fee has the lowest present value.

Should the airport use the proposers' own fuel volume forecasts?

No. Scoring on a proposer's forecast rewards optimism. The sponsor sets one volume assumption, publishes it in the solicitation, and applies every offer to it.

How much weight should financial return carry in an FBO RFP?

That is the sponsor's decision. This sample gives it 25 of 100 points and then tests 15 and 35. The ranking is the same at all three, which is the result a sponsor wants to see before it awards. The weight would have to pass 74.8 points before the result changed.

What does a minimum annual guarantee do?

It sets a floor under the payment when volumes fall. In this sample the guarantees do not bind on the sponsor's assumptions. With volumes 30 percent lower, one proposer's guarantee sets its payment at $500,000, and the proposer with no guarantee pays $464,100.

Does the scoring formula change who wins an FBO RFP?

It can. In this sample the three financial offers are within 3.1 percent of each other. A formula that awards points in proportion to present value separates them by less than one point. A formula that gives the lowest offer no points and the highest all 25 would move a different proposer to first place. Exhibit 36 shows both. The formula is published with the solicitation and applied without change.

How long should the lease term be in an FBO RFP?

Long enough for the operator to recover the investment the solicitation requires, and the same for every proposer so that the offers can be compared. This sample sets 25 years from the minimum required investment per square foot of the area to be developed, under the term schedule in the sponsor's leasing policy. FAA Order 5190.6C states that ground leases of 30 to 35 years are generally sufficient for major facilities.

Can I download this sample scoring matrix?

The sample is published as a web page, so there is nothing to download. If you would like a copy, email Valuationtakesflight@outlook.com and we will send one.

More on the method behind this document: FBO RFP support for airport sponsors, aviation business and FBO valuation, how fixed base operators are valued, and ground-lease reversion risk.