A hangar feasibility study answers one question before money is committed: is there enough demand, at a rent high enough, to pay for what the hangars cost to build. It is the first step in a hangar development project and the document a board, a lender or a grant reviewer asks for.
Airport sponsors commission the study before building T-hangar rows or box hangars, or before offering ground to a private developer. Developers and their lenders commission it to underwrite a specific site. The analysis is the same on either side.
What the study covers
- Demand. Based aircraft and fleet mix, the existing hangar inventory, and occupancy and rents at the airports that compete for the same aircraft.
- Waiting list test. A waiting list shows demand at the rent charged today. We contact the names on it and count those who would commit at the rent a new building needs.
- Market rent. Rent by hangar type from comparable lease evidence, benchmarked against the GA Hangar Rent Index.
- Return. Income, expenses and capital renewal over the life of the building, set against development cost: return on cost, internal rate of return and net present value.
- Build or ground lease. For a sponsor, what the project is worth if the airport builds it and what it is worth if tenants build on leased ground and the improvements revert.
- Funding. The effect of grant funding on the result, and the share of cost at which the project breaks even.
A hangar feasibility study on a ten unit T-hangar building and four box hangars: both waiting lists tested, market rent concluded, 40 year cash flows, and the build or ground lease comparison. In the sample the box hangars pass and the T-hangars do not.
What the study is not
It is a study of demand, rent and financial return. It is not an engineering or site design product. Construction cost comes from the sponsor's engineer or the builder, and we use it as given.
What comes after
Where the study supports the project, the next documents are the ones that put it into effect: ground lease terms under an airport leasing policy and rents and fees policy, a rent for the new units from an airport hangar rent study, and for a lender, an aircraft hangar appraisal of the finished building. Related research covers hangar waiting lists and FAA rate policy and where federal dollars are building hangars.
Frequently asked questions
What is a hangar feasibility study?
A study that tests whether a proposed hangar project has enough demand, at a rent high enough, to cover its development cost. It concludes market rent for the new units and reports return on cost, internal rate of return and net present value.
Is a hangar waiting list enough to justify building?
No. A waiting list shows demand at the current rent, which is usually below what a new building needs. The study tests the list at market rent and counts only the names that would commit.
Who needs a hangar feasibility study?
Airport sponsors deciding whether to build or to ground lease, developers and investors underwriting a site, and lenders financing hangar construction.
Do you estimate construction cost?
No. Construction cost comes from the sponsor's engineer or the builder. We study demand, rent and financial return.
What does it cost?
Fees are quoted once the scope is set. Cost depends on the number of hangar types, the number of competing airports surveyed, and whether a build or ground lease comparison is included.
Discuss a hangar project
Send a short note about the airport and the project, and we will reply with a scope and fee quote.
Schedule a Consultation