Project
East hangar area, Wexley Field
Ten T-hangar units and four 60 by 60 foot box hangars
Prepared for
Wexley Field Airport Authority
Date of study
October 30, 2026
Finding
Box hangars feasible. T-hangars not feasible on rent alone
Prepared by
Valuation Takes Flight LLC
Dr. Clay W. Carter, DBA, CFA, FRM, CAIA, CIPM
Length
12 sections · 4 addenda · 35 exhibits
SampleThis is an illustrative sample, not a study of any real airport. Wexley Field, the Wexley Field Airport Authority, the competing airports and every figure in this study are fictional, assembled to show the format, method and level of support a client receives. It should not be relied upon for any project, financing or grant application.

Letter of Transmittal

October 30, 2026

Board of Commissioners
Wexley Field Airport Authority

Re: Proposed T-hangar and box hangar development, east hangar area, Wexley Field. Feasibility and demand study.

Dear Commissioners,

At your request we have studied whether the Authority should build the hangars shown for the east hangar area on the airport layout plan: one ten unit T-hangar building and four 60 by 60 foot box hangars. You asked whether there is demand at a rent that pays for the buildings, whether the Authority should build them or lease the ground to others, and what rent the new units should carry.

Our findings are as follows. The box hangars are feasible. At a market rent of $12.00 per square foot per year they return 7.52 percent on a cost of $2,328,704, against the Authority's 6.50 percent hurdle, with a net present value of $363,820. The T-hangar building is not feasible on rent alone. At a market rent of $450 per month it returns 2.08 percent on a cost of $1,687,840, and its net present value is ($917,042). It becomes feasible only if grant funding covers at least 54.3 percent of the cost.

We recommend that the Authority offer the four box hangar sites by ground lease, which is worth $642,337 to the Authority in present value with no capital at risk, and that it build the T-hangars only if grant funding is secured.

This study is a sample. The airport, the parties and every figure in it are illustrative, assembled to show the format and depth of analysis we deliver.

Respectfully submitted,

VALUATION TAKES FLIGHT LLC
Dr. Carter, DBA, CFA, FRM, CAIA, CIPM
Signature omitted. This is a sample study.

1. Summary of Findings

ItemT-hangar buildingBox hangars
ProgramOne building, ten nested units, 1,260 SF eachFour units, 60 by 60 feet, 3,600 SF each
Building area12,600 SF14,400 SF
Total development cost$1,687,840$2,328,704
Concluded market rent$450 per unit per month$12.00 per SF per year, $3,600 per unit per month
Qualified demand at that rent17 names for 10 units7 names for 4 units
Stabilized net operating income$40,880$137,445
Return on cost2.42 percent5.90 percent
Internal rate of return, 40 years2.08 percent7.52 percent
Net present value at 6.50 percent($917,042)$363,820
FindingNot feasible on rent aloneFeasible
RecommendationBuild only with grant funding of at least 54.3 percent of costOffer the sites by ground lease

Exhibit 1. Summary of findings. Illustrative figures for a sample airport.

What would change the findings

Each finding holds within limits. The table states the limit for each, so the Board can see how much room it has.

FindingIt would change ifWhere the limit sits
T-hangars are not feasible on rent aloneGrants pay a large share of cost, or rent rises far above what the survey supportsGrants of 54.3 percent of cost, or a rent of $838 per month against a concluded $450
Box hangars are feasible if the Authority buildsRent, cost, vacancy or growth moves against the projectRent below $10.43 per square foot, cost more than 15.1 percent above the estimate, stabilized vacancy above 16.3 percent, or growth below 1.75 percent a year
A ground lease is worth more than buildingThe Authority's cost of funds is low, or the lease term runs longA discount rate below 5.46 percent, or a term that reaches 40 years

Exhibit 2. The limits within which each finding holds. Illustrative figures for a sample airport.

2. Scope of the Study

The questions

The study answers the three questions in the letter of transmittal: demand at a rent that covers cost, who should build, and what the new units should rent for. The intended user is the Board, for a decision on the east hangar area in the next capital program.

What we did

We toured the east hangar area and the existing hangars. We read the airport layout plan, the leasing policy, the rents and fees schedule, and the hangar waiting lists. We obtained based aircraft counts for three years from airport management. We surveyed hangar rents, occupancy and waiting lists at the three airports that compete with Wexley Field for based aircraft, and confirmed each rent with the sponsor or the operator. We contacted every name on both waiting lists.

What we did not do

This is a study of demand, rent, and financial return. It is not an engineering or site design product. Construction cost figures were supplied by the Authority's engineer and we did not verify them. We did not study environmental conditions or airspace.

Method

  1. Demand. We count names on the waiting lists, reach as many as will answer, and ask each one for a commitment at a stated rent. Only names that would sign and place a deposit are counted.
  2. Rent. We compare rents at the competing airports, adjust them for age and for the airport, and test the result against what the waiting list names said they would pay.
  3. Return. We project income, expenses and capital renewal for 40 years and discount them at the Authority's 6.50 percent rate. A project is feasible when the present value of its cash flow exceeds its cost.
  4. Who should build. We value the same sites under a ground lease, where a tenant builds and the hangars pass to the Authority at expiration, and compare the result with building.

Assumptions in one place

AssumptionT-hangar buildingBox hangars
Units10 units of 1,260 square feet4 units of 3,600 square feet
Market rent$450 per unit per month$12.00 per square foot per year
Vacancy and collection loss, year 15 percent15 percent
Vacancy and collection loss, later years3 percent3 percent
Operating expenses and reserves$1,150 per unit18 percent of effective gross income
Growth in rent and expenses2.75 percent a year2.75 percent a year
Capital renewal10 percent of building cost in year 20, escalated10 percent of building cost in year 20, escalated
Building cost$95 per square foot$118 per square foot
Site work, taxilane, apron and utilities$310,000$380,000
Design, permitting, inspection and contingency12 percent12 percent
Period of analysis40 years, with no value at the end40 years, with no value at the end
Discount rate6.50 percent6.50 percent

Exhibit 3. The assumptions behind the financial analysis. Illustrative figures for a sample airport.

3. Wexley Field and the Competing Airports

Wexley Field is a general aviation airport with one 6,000 foot runway, a full parallel taxiway, a precision instrument approach, one fixed base operator, and both jet A and 100LL. It is federally obligated. The Authority owns 84 T-hangar units built between 1998 and 2006 and six box hangars, all occupied. Fourteen private hangars stand on ground leases.

Based aircraftThree years agoLast yearCurrent
Single engine piston112115118
Multi engine piston222221
Turboprop151617
Jet182022
Helicopter778
Total174180186

Exhibit 4. Based aircraft at Wexley Field, from airport records. Illustrative figures for a sample airport.

The fleet has grown by twelve aircraft in three years, and six of the twelve are turbine. Piston singles fill T-hangars. Turboprops, light jets and twins fill box hangars. Growth is strongest in the aircraft that need the larger unit.

AirportRoleLongest runwayBased aircraftT-hangar rent per monthBox hangar rent per SF per yearOccupancyWaiting list
Wexley Field, existing unitsGeneral aviation reliever6,000 ft186$365$9.60100 percent46 T-hangar, 31 box
Corbin RegionalGeneral aviation5,400 ft152$395$10.20100 percent14 names
Halverson ExecutiveCorporate emphasis7,100 ft171$520$14.40100 percent44 names
Delmar MunicipalBasic general aviation4,300 ft88$290$7.2091 percentNone

Exhibit 5. Competing airports, hangar rent and occupancy. Illustrative figures for a sample airport.

Three of the four fields are full. Two box hangars totaling 30,000 square feet are under construction at Halverson. Nothing is under construction at Wexley Field or Corbin.

Where the fleet is stored

StorageSupplyBased aircraft
Authority T-hangars84 units84
Authority box hangars6 units9
Private hangars on ground leases14 hangars24
Community hangar of the fixed base operator24,000 square feet14
TiedownsAssigned by the month55
Total186

Exhibit 6. Where the 186 based aircraft are stored, from airport records. Illustrative figures for a sample airport.

Fifty-five aircraft sit outside on tiedowns. They are the first source of demand for a new hangar, and the waiting lists also carry owners based at other airports.

Fleet growth by class

The based fleet grew from 174 to 186 in three years, 2.2 percent a year. Turboprops and jets together went from 33 to 39, and piston singles from 112 to 118. Six more turbine aircraft are six more candidates for a box hangar, and none of the Authority's six is vacant.

Supply on the way

The two box hangars under construction at Halverson Executive add 30,000 square feet at an airport that charges $14.40 per square foot, 20 percent above the rent concluded here. They will take some turbine owners who value the longer runway. They do not compete for an owner who wants to stay at Wexley Field at $12.00.

4. Testing the Waiting Lists

A waiting list shows demand at the rent charged today. The Authority's lists were built at $365 per month for a T-hangar and $9.60 per square foot for a box hangar. New buildings cannot be rented at those rates. We therefore asked each name what it would do at the rent a new building needs.

Waiting listNames on listReachedWould rent at current rateWould sign at market rent for a new unitWould sign at a higher test rent
T-hangar462929 at $36517 at $4506 at $550
Box hangar311919 at $9.60 per SF7 at $12.00 per SF3 at $14.00 per SF

Exhibit 7. Waiting list survey. Each respondent was asked whether it would sign a twelve month agreement and place a deposit at the stated rent. Illustrative figures for a sample airport.

Seventeen names would take a new T-hangar at $450, which covers the ten proposed units 1.7 times. Seven would take a box hangar at $12.00 per square foot, which covers the four proposed units 1.75 times. Seventeen of the T-hangar names and twelve of the box hangar names could not be reached, and we give them no weight.

Effect of the test

On the raw lists the Authority has 77 names for 14 units. At the rent the new buildings need, it has 24. That is enough to fill both buildings, and it is the figure a lender or grant reviewer will rely on.

Two bar charts of the number of waiting list names that would sign at each rent tested, for T-hangar units and for box hangars, with a dashed line at the number of units proposed
Exhibit 8. Names that would sign at each rent tested. The dashed line marks the units proposed. Illustrative figures for a sample airport.

The rent that fills the buildings

The survey gives three points on each demand curve. Read on a straight line between the last two, ten T-hangar units fill at about $514 per month and four box hangars fill at about $13.50 per square foot. Both are above the rents we conclude in Section 5. We hold to $450 and $12.00 because each leaves its building covered about 1.7 times, and a study should not rest on the last name on the list.

The higher rents would not change the T-hangar finding. At $514 the net present value is ($766,747). At $13.50 the box hangars would be worth $710,756.

From names to signed agreements

A name that says it would sign is not a signed agreement. The table shows how many units fill if only a share of the names follow through.

Share of names that signT-hangar names that signTen units fillBox hangar names that signFour units fill
100 percent17Yes7Yes
75 percent12Yes5Yes
60 percent10Yes4Yes
50 percent8No3No

Exhibit 9. Units filled if only a share of the names that said they would sign do so. Illustrative figures for a sample airport.

The T-hangar building fills if 59 percent of the 17 names sign, and the box hangars fill if 57 percent of the 7 do. Before a construction contract is awarded, the Authority should hold signed agreements with deposits for at least seven of the ten T-hangar units and three of the four box hangars.

Where the demand comes from

Names that would sign at market rentT-hangarBox hangar
Aircraft on a Wexley Field tiedown111
Aircraft in the community hangar02
Aircraft based at another airport43
Buying an aircraft21
Total177

Exhibit 10. Where the names that would sign keep their aircraft today. Illustrative figures for a sample airport.

T-hangar demand is mostly local: 11 of the 17 names already pay the Authority for a tiedown. Box hangar demand is mostly new to the Authority's rent roll. Section 8 counts what that difference is worth.

5. Market Rent for the New Units

New units rent above units that are twenty years old, and the evidence brackets the premium. The existing T-hangars rent at $365 and Halverson, a stronger field, rents at $520. The survey in Section 4 shows demand holding at $450 and thinning at $550. We conclude a market rent of $450 per month for a new T-hangar unit.

For box hangars the existing units rent at $9.60 per square foot and Halverson at $14.40. Demand holds at $12.00 and thins at $14.00. We conclude $12.00 per square foot per year, which is $3,600 per month for a 3,600 square foot unit, with the Authority paying building insurance, structural maintenance and common area costs.

Both rents are within what FAA Order 5190.6C, paragraph 17.9, allows for aeronautical hangars, where rent may be set at fair market value. Grant Assurance 24 asks for a fee and rental structure that makes the airport as self-sustaining as possible.

Adjustment of the comparable rents

The table adjusts each comparable rent to a new unit at Wexley Field. The first adjustment is for age and condition. The second is for the airport: runway, services and the depth of its market.

ComparableT-hangar rent per monthBox rent per square footAge and conditionAirportT-hangar, adjustedBox, adjusted
Wexley Field, existing units$365$9.60Up 20 percentNone$438$11.52
Corbin Regional$395$10.20Up 10 percentUp 5 percent$456$11.78
Halverson Executive$520$14.40Up 5 percentDown 15 percent$464$12.85
Delmar Municipal$290$7.20Up 25 percentUp 20 percent$435$10.80

Exhibit 11. Comparable rents adjusted to a new unit at Wexley Field. Adjustments are applied in sequence. Illustrative figures for a sample airport.

The adjusted T-hangar rents run from $435 to $464 and the adjusted box hangar rents from $10.80 to $12.85. The concluded rents of $450 and $12.00 sit inside both ranges, and the survey in Section 4 confirms that demand holds at each. In an engagement each adjustment is supported by paired rents, and the support is shown.

Market rent against the rent that pays for the building

UnitMarket rentRent that returns 6.50 percent on costMarket rent as a share of it
New T-hangar unit, per month$450$83853.7 percent
New box hangar, per square foot per year$12.00$10.43115.1 percent

Exhibit 12. Market rent and the rent that would return the Authority's rate on the cost of each building. Illustrative figures for a sample airport.

The two products sit on opposite sides of cost. A new box hangar rents for more than it costs to provide. A new T-hangar rents for about half. FAA Order 5190.6C, paragraph 17.9, lets a sponsor charge for hangars at a level between cost and fair market value. For the T-hangars that range is empty, because the market will not pay cost. That is the feasibility finding stated as a rent.

6. Development Cost

The Authority's engineer supplied the following cost estimates in current dollars. We use them as given.

T-hangar building

Cost lineAmount
Building, 12,600 SF at $95 per SF$1,197,000
Site work, taxilane, apron and utilities$310,000
Design, permitting, inspection and contingency at 12 percent$180,840
Total development cost$1,687,840
Cost per unit$168,784

Exhibit 13. T-hangar development cost, from the Authority's engineer. Illustrative figures for a sample airport.

Box hangars

Cost lineAmount
Building, 14,400 SF at $118 per SF$1,699,200
Site work, taxilane, apron and utilities$380,000
Design, permitting, inspection and contingency at 12 percent$249,504
Total development cost$2,328,704
Cost per square foot of building$162

Exhibit 14. Box hangar development cost, from the Authority's engineer. Illustrative figures for a sample airport.

What the estimate covers

ItemTreatment
Buildings, doors, slab and electrical serviceIncluded, at $95 and $118 per square foot
Taxilane, apron, drainage and utilities to the buildingsIncluded as site work
Design, permitting, inspection and contingencyIncluded at 12 percent
LandOwned by the Authority. No cost is charged
Interest during construction and financing costsNot included
Off-site utility extensions and environmental workNot included. None was identified to us

Exhibit 15. What the engineer's estimate includes and leaves out. Illustrative figures for a sample airport.

Cost risk

The estimate is in current dollars, and construction cost has been rising. The Turner Building Cost Index rose 8.0 percent in 2022, 6.0 percent in 2023, 3.9 percent in 2024 and 4.1 percent in 2025, as reported in the firm's paper on hangar waiting lists and FAA rate policy. At the 2025 rate, a one year delay adds $95,477 to the box hangars and $69,201 to the T-hangar building.

The box hangars stay feasible until cost runs 15.1 percent over the estimate. Bids should be compared with that margin before a contract is awarded.

7. T-Hangar Financial Feasibility

LineAmount
Gross potential rent$54,000
Less vacancy and collection loss at 3 percent($1,620)
Effective gross income$52,380
Less operating expenses and reserves, $1,150 per unit($11,500)
Net operating income, stabilized$40,880
Total development cost$1,687,840
Return on cost2.42 percent

Exhibit 16. T-hangar stabilized operating statement, first year dollars. Illustrative figures for a sample airport.

A return on cost of 2.42 percent does not cover the Authority's cost of funds. Over a 40 year building life, with rent and expenses growing 2.75 percent a year and a capital renewal of 10 percent of building cost in year 20, the cash flow is worth $770,798 at 6.50 percent. The building costs $1,687,840. The net present value is ($917,042).

YearEffective gross incomeOperating expensesNet operating incomeCapital renewalCash flow
1$51,300($11,500)$39,800$0$39,800
2$53,820($11,816)$42,004$0$42,004
3$55,301($12,141)$43,159$0$43,159
5$58,384($12,818)$45,566$0$45,566
10$66,865($14,680)$52,185$0$52,185
20$87,704($19,255)$68,449($205,935)($137,487)
30$115,037($25,256)$89,781$0$89,781
40$150,889($33,128)$117,761$0$117,761

Exhibit 17. T-hangar cash flow, selected years. Illustrative figures for a sample airport.

The rent that would bring the net present value to zero is $838 per month. Six names on the waiting list would pay $550, and the break-even rent is well beyond that. The T-hangars cannot be built on rent alone.

With grant funding

Share of cost paid by grantsAuthority's costNet present value to the Authority
0 percent$1,687,840($917,042)
25 percent$1,265,880($495,082)
50 percent$843,920($73,122)
75 percent$421,960$348,838
90 percent$168,784$602,014

Exhibit 18. T-hangar net present value by grant share. Illustrative figures for a sample airport.

The building breaks even when grants pay 54.3 percent of the cost. Above that share the T-hangars add value. Grant Assurance 24 excludes the federal share of grant-funded development from the rate base, so a grant-funded building also supports a lower cost-based rent if the Board prefers one.

Where the value falls short

PeriodT-hangars, present valueShare of costBox hangars, present valueShare of cost
Years 1 to 10$327,38819.4 percent$1,088,17446.7 percent
Years 11 to 20$171,02710.1 percent$688,55529.6 percent
Years 21 to 30$160,3439.5 percent$539,09923.2 percent
Years 31 to 40$112,0406.6 percent$376,69616.2 percent
Total$770,79845.7 percent$2,692,524115.6 percent

Exhibit 19. Present value of cash flow by decade, for both buildings, at 6.50 percent. Illustrative figures for a sample airport.

Line chart of the cumulative present value of cash flow as a percent of development cost over 40 years, with box hangars passing 100 percent near year 31 and T-hangars reaching 45.7 percent
Exhibit 20. Cumulative present value of cash flow as a share of development cost. The step at year 20 is the capital renewal. Illustrative figures for a sample airport.

Over 40 years the T-hangar building returns 45.7 percent of its cost in present value. The box hangars return their cost in year 31 and 115.6 percent by year 40. The T-hangars never come close, in any decade.

Funding the gap

The gap is $917,042. Federal law lets a nonprimary airport put its entitlement into a hangar once airside needs are provided for. The entitlement is $150,000 a year and may be banked for up to four years, so about $600,000 is available. Section 10 sets out the rules.

FundingAmountNet present value to the Authority
Rent alone$0($917,042)
Banked nonprimary entitlement$600,000, 35.5 percent of cost($317,042)
Entitlement and a further grant$917,042 in grants, 54.3 percent of cost$0
Interest free loan for 80 percent of cost, repaid over 20 years, and no grant$1,350,272 loan($310,669)
Entitlement, and an interest free loan for 80 percent of the balance$600,000 grant and $870,272 loan$73,775

Exhibit 21. T-hangar net present value under five ways of funding the building. Illustrative figures for a sample airport.

The entitlement alone leaves a gap of $317,042. With it, the rent that breaks even is $584 per month, and only six names would pay $550. A second source closes the gap. At the Authority's rate an interest free loan is worth 44.9 cents for every dollar borrowed, because the Authority repays in later dollars without interest. Minnesota offers state system airports an 80 percent interest free hangar loan repaid over 20 years, described in the firm's paper on federal hangar funding. If the Authority's state offers a program of that kind, entitlement and loan together bring the T-hangars to a positive result of $73,775.

8. Box Hangar Financial Feasibility

LineAmount
Gross potential rent$172,800
Less vacancy and collection loss at 3 percent($5,184)
Effective gross income$167,616
Less operating expenses and reserves at 18 percent($30,171)
Net operating income, stabilized$137,445
Total development cost$2,328,704
Return on cost5.90 percent

Exhibit 22. Box hangar stabilized operating statement, first year dollars. Illustrative figures for a sample airport.

We assume three of the four units are leased at opening and the fourth within the first year, which is a 15 percent vacancy in year 1 and 3 percent after. On the same 40 year basis the cash flow is worth $2,692,524 against a cost of $2,328,704. The net present value is $363,820 and the internal rate of return is 7.52 percent.

YearEffective gross incomeOperating expensesNet operating incomeCapital renewalCash flow
1$146,880($26,438)$120,442$0$120,442
2$172,225($31,001)$141,225$0$141,225
3$176,962($31,853)$145,109$0$145,109
5$186,828($33,629)$153,199$0$153,199
10$213,970($38,515)$175,455$0$175,455
20$280,653($50,518)$230,136($292,335)($62,199)
30$368,119($66,261)$301,858$0$301,858
40$482,844($86,912)$395,932$0$395,932

Exhibit 23. Box hangar cash flow, selected years. Illustrative figures for a sample airport.

Sensitivity to rent and cost

Net present valueCost 10 percent lowerCost as estimatedCost 10 percent higher
Rent 10 percent lower$327,438$86,271($154,895)
Rent as concluded$604,986$363,820$122,654
Rent 10 percent higher$882,535$641,369$400,202

Exhibit 24. Box hangar net present value under rent and cost changes. Illustrative figures for a sample airport.

The project stays positive in eight of the nine cases. It turns negative only when rent comes in 10 percent low and cost comes in 10 percent high together. The margin is positive but narrow.

Break-even points

InputAs concludedValue at which the net present value is zero
Market rent per square foot$12.00$10.43
Development cost$2,328,704$2,680,008, 15.1 percent above the estimate
Vacancy and collection loss after year 13 percent16.3 percent
Growth in rent and expenses2.75 percent1.75 percent
Discount rate6.50 percent7.52 percent, the internal rate of return

Exhibit 25. Box hangar break-even points, each input moved alone. Illustrative figures for a sample airport.

Rent can fall 13.1 percent, or cost can rise 15.1 percent, before the project stops paying. Growth leaves less room than the others: the project needs rent to rise at least 1.75 percent a year for 40 years.

If the Authority borrows

A positive net present value over 40 years does not mean the project pays its own debt from the first year. The table tests level debt for the full cost at 5.00 percent, an assumed rate.

Loan termAnnual debt serviceCoverage in year 2Coverage in year 10Coverage reaches 1.00Coverage reaches 1.25
20 years$186,8610.760.94Year 13Not within the loan
25 years$165,2270.851.06Year 8Year 17
30 years$151,4860.931.16Year 5Year 13

Exhibit 26. Debt service coverage if the Authority borrows the full cost of the box hangars at 5.00 percent. Illustrative figures for a sample airport.

On a 25 year loan the box hangars cover 85 percent of their debt service in year 2 and do not cover it in full until year 8. The Authority would carry the shortfall from other revenue for seven years. The project is feasible on value and is not self-supporting on debt in its first years, which is one more reason to look at the ground lease.

Simulation

We drew 10,000 cases in which four inputs vary together: cost around the estimate with a standard deviation of 8 percent, market rent with a standard deviation of 7 percent, growth around 2.75 percent with a standard deviation of 0.75 points, and vacancy between 1 and 5 percent. The ranges are assumptions.

Result of 10,000 casesT-hangars, Authority buildsBox hangars, Authority buildsBox hangar sites, ground lease
Mean net present value($912,340)$381,917$653,922
5th percentile($1,207,244)($273,726)$473,696
95th percentile($608,970)$1,087,571$882,085
Share of cases with a positive result0.0 percent82.0 percent100.0 percent

Exhibit 27. Simulation of cost, rent, growth and vacancy. Illustrative figures for a sample airport.

Range chart of net present value across 10,000 simulated cases for the T-hangars, the box hangars built by the Authority, and the box hangar sites under ground lease, showing the 5th to 95th percentile and the median
Exhibit 28. Range of net present value across the simulated cases. Each bar spans the 5th to 95th percentile and the marker is the median. Illustrative figures for a sample airport.

The T-hangars are negative in every case. The box hangars are positive in 82 percent of cases if the Authority builds, with a range of nearly $1.4 million between a poor outcome and a good one. The ground lease is positive in every case and its range is a third as wide, because the tenant carries cost and leasing. The ground lease is worth more than building in 80 percent of cases.

Revenue outside the buildings

The analysis counts hangar rent only. A new tenant also changes two other lines of the Authority's income. An aircraft that moves to the airport buys fuel here, and the Authority collects the flowage fee of $0.12 per gallon. An aircraft that moves from a tiedown into a hangar stops paying tiedown rent of $85 per month. From the Authority's flowage records, a based piston single uplifts about 610 gallons a year and a based turbine aircraft about 21,400.

EffectFirst yearPresent value over 40 years
Flowage from four piston aircraft new to the airport, T-hangars$293$5,947
Tiedown rent given up by six tenants that move, T-hangars($6,120)($124,295)
Flowage from two turbine aircraft new to the airport, box hangars$5,136$104,310

Exhibit 29. Income outside the buildings that the financial analysis leaves out. The split between new and existing tenants follows the survey. Illustrative figures for a sample airport.

Counting these lines would lower the T-hangar result by about $118,000, unless the tiedowns are let again, and raise the box hangar result by about $104,000. Neither changes a finding. They point the same way the findings do: the box hangars bring new aircraft and new fuel sales, and the T-hangars mostly move tenants the Authority already has.

9. Build or Ground Lease

The Authority does not have to build the box hangars to benefit from them. It can lease the four sites to tenants who build their own hangars under the leasing policy. We compared the two on the same 40 year horizon and the same 6.50 percent rate.

Under a ground lease the Authority leases four sites of 8,400 square feet each, 33,600 square feet in all, at the scheduled aeronautical ground rent of $0.45 per square foot. That is $15,120 in the first year, adjusted 2.75 percent a year, for a 30 year term. At expiration the improvements revert to the Authority, which then collects the building rent for the last ten years of the building's life.

ItemAuthority buildsGround lease to tenants
Capital required from the Authority$2,328,704$0
Present value of ground rent, years 1 to 30Not applicable$265,642
Present value of building income$2,692,524, years 1 to 40$376,696, years 31 to 40
Net present value to the Authority$363,820$642,337
Who carries construction and leasing riskThe AuthorityThe tenants

Exhibit 30. Authority-built and ground lease alternatives for the box hangar sites. Illustrative figures for a sample airport.

The ground lease is worth $642,337 to the Authority and building is worth $363,820. The ground lease also leaves $2,328,704 of capital available for projects no tenant will fund. Building gives the Authority control of the units and all of the income from the first year. On these figures the ground lease is the stronger choice.

The tenant's side of the ground lease

A ground lease has value to the Authority only if tenants will build. We modeled one box hangar from the tenant's side: a cost of $582,176 on an 8,400 square foot site, ground rent at $0.45, and the same expenses and renewal as above. An owner that builds for its own aircraft saves the $12.00 rent it would pay. An investor earns that rent, less 3 percent vacancy. Neither receives anything for the hangar at expiration.

Lease termPresent value to the Authority, four sitesOwner's return, own aircraftInvestor's return
25 years$860,7934.66 percent4.34 percent
30 years$642,3375.80 percent5.52 percent
35 years$459,7276.50 percent6.24 percent
40 years$307,0816.96 percent6.71 percent

Exhibit 31. The ground lease from both sides, by length of term. Illustrative figures for a sample airport.

Term moves value between the parties. At 30 years the Authority's interest is worth $642,337 and an owner earns 5.80 percent. At 35 years the owner reaches the Authority's own 6.50 percent rate. At 40 years the Authority receives ground rent only within the life of the building, $307,081, which is less than the $363,820 it would earn by building.

Two conclusions follow. At the 30 year term the leasing policy sets for this investment, the ground lease is the stronger choice for the Authority. Each five year option the Board later grants defers the reversion and has a price: the first costs the Authority $182,610 in present value and the second $152,646. And the tenant's return at 30 years is modest. Owners build hangars for reasons beyond return, and no box hangar is available to rent at any price while 31 names wait for six units. The margin is thin enough that the Authority should test interest before it relies on the ground lease. Section 11 makes that the first step.

When building is worth more

The comparison depends on the rate. At 6.50 percent the ground lease is worth $278,517 more than building. The two are equal at 5.46 percent. If the Authority can fund the hangars at a cost below that rate, and is willing to carry construction and leasing risk, building is worth more.

Who carries what

RiskAuthority buildsGround lease
Construction costAuthorityTenant
Lease-up and vacancyAuthorityTenant
Maintenance and capital renewalAuthorityTenant, during the term
Market rent for the buildingsAuthority, from year 1Authority, after reversion
Whether anyone buildsNoneAuthority. The sites earn nothing until a tenant commits
Condition of the hangars at year 30Authority controls itDepends on the surrender terms of the lease

Exhibit 32. Risk carried under each alternative. Sample provisions.

10. Compliance Notes

  1. The east hangar area is shown for hangar development on the airport layout plan. Grant Assurance 29 requires development to conform to the approved plan.
  2. Ground leases for the box hangar sites should follow the Authority's leasing policy on term, rent adjustment, and reversion, and should be offered so that every interested party has the same opportunity. Grant Assurance 22 requires reasonable terms without unjust discrimination.
  3. New units must be used for aeronautical purposes. Under the FAA's policy on non-aeronautical use of airport hangars, storage of active aircraft is aeronautical use.
  4. If the T-hangars are built with grant funds, the grant terms and Grant Assurance 24 govern how the federal share enters the rate base.

These notes identify the federal provisions that bear on the decision. They are not legal advice.

Rules on funding a hangar

RuleSourceEffect on this project
A hangar is a revenue producing aeronautical support facility49 U.S.C. 47102(24)Eligible for federal funds only on the terms below
The federal share comes only from nonprimary entitlement funds, at a nonprimary airport49 U.S.C. 47110(h)Wexley Field is a nonprimary airport. Discretionary funds are not available for the buildings
The sponsor must have provided for the airside needs of the airport49 U.S.C. 47110(h)The Authority shows that airfield needs for the current and next two fiscal years are funded before it applies
The entitlement is $150,000 a year and may be banked for up to four years49 U.S.C. 47114(d)(2)(A) and 47117(b)(1)About $600,000, which is 35.5 percent of the T-hangar cost
A 95 percent federal share applied to nonhub and nonprimary airports in fiscal years 2025 and 202649 U.S.C. 47109(h)The Authority confirms the share in force for the year of the grant
Airport Infrastructure Grants do not carry the conditions in section 47110(h)Public Law 117-58. Allocated for fiscal years 2022 through 2026 and available until September 30, 2030Any allocation the Authority has not spent may be applied to a hangar
Where an aircraft owner builds a hangar at its own expense, the sponsor grants a long-term leaseGrant Assurance 38 and 49 U.S.C. 47107(a)(21)Supports the ground lease of the box hangar sites

Exhibit 33. Federal rules on funding a hangar and what each means here. Summaries, not legal advice.

Terms the leasing policy sets for the box hangar sites

TermLeasing policyApplied to a box hangar site
Initial termBy investment per square foot of the area developed, clause 8.1$69.31 per square foot meets the $50 tier: up to 30 years
OptionsUp to two of five years, each with Board consent, clause 8.2Each defers the reversion valued in Section 9
Ground rentSchedule rate, clause 9.1$0.45 per square foot, $3,780 a year for each site
AdjustmentIndex each year and a reset every fifth year, Section 10Modeled here at 2.75 percent a year
TitlePasses to the Authority at expiration, clause 11.3Building rent to the Authority from year 31
Cost certificationWithin 120 days after completion, clause 8.6Confirms the tier on which the term was set
UseAeronautical, clause 14.3Storage of active aircraft and the other uses the FAA policy lists

Exhibit 34. How the Authority's leasing policy applies to a ground lease of a box hangar site. Sample provisions.

Clause references are to the Authority's Leasing Policy and Rents and Fees Policy.

11. Findings and Recommendation

  1. Demand exists for both products at market rent: 17 qualified names for ten T-hangars and 7 for four box hangars.
  2. Market rent for new units is $450 per month for a T-hangar and $12.00 per square foot per year for a box hangar.
  3. The box hangars are feasible, with a net present value of $363,820 if the Authority builds them.
  4. Offering the box hangar sites by ground lease is worth more to the Authority, $642,337, and requires no capital.
  5. The T-hangar building is not feasible on rent alone. It should proceed only if grants cover at least 54.3 percent of its cost.
Ground lease the box hangar sites. Build the T-hangars only with grant funding.
Box hangars: feasible · T-hangars: not feasible on rent alone

Implementation

StepWhat the Authority doesDecision it supports
1Asks the seven box hangar names, and the public, whether they would build on a 30 year ground lease at the Schedule rentWhether tenants will build
2If four qualified parties commit, offers the four sites under the leasing policyGround lease, as recommended
3If fewer commit, builds the remaining hangars itself, where bids are within 15.1 percent of the estimateThe fallback: building is feasible
4Banks its entitlement and asks the state about hangar loan or grant fundsWhether the T-hangar gap can be closed
5Takes signed agreements with deposits for the T-hangar units at $450Whether the demand is real
6Returns to the Board with funding and commitments in handWhether to build the T-hangars

Exhibit 35. Implementation steps. Sample provisions.

Decision gates for the T-hangars

  1. Funding. Grants, or the value of a subsidized loan, cover at least 54.3 percent of cost, $917,042.
  2. Commitments. Signed agreements with deposits are in hand for at least seven of the ten units at $450 per month.
  3. Cost. Bids confirm the estimate. Each 10 percent of added cost adds about $169,000 to the gap.
  4. Airside needs. The Authority can show that airfield needs for the current and next two fiscal years are funded.

What to watch

  1. The lists. The count on each waiting list, published each quarter under the leasing policy. A falling box hangar list after Halverson's hangars open would weaken the case.
  2. Construction cost. The estimate is in current dollars. It should be refreshed if a contract is not awarded within a year.
  3. Rent at the competing airports. The concluded rents rest on four airports. A change at Corbin or Halverson moves the range.

12. About Valuation Takes Flight

Valuation Takes Flight LLC is an aviation valuation and advisory firm. Dr. Clay W. Carter, DBA, CFA, FRM, CAIA, CIPM, founded the firm and leads every engagement. He is the author of Valuing Aircraft Hangars: A Textbook for Real Estate Appraisers, and the firm publishes the GA Hangar Rent Index, a quarterly market-rent benchmark for US general aviation hangar storage.

The firm prepares hangar feasibility and demand studies, hangar rent studies, rates and charges studies, and hangar appraisals for airport sponsors, developers, lenders and owners nationwide. Construction cost in a feasibility study comes from the client's engineer or builder.

Addendum A. Assumptions and Limiting Conditions

  1. This is a study of demand, rent and financial return. It is not an appraisal, an engineering report or a legal opinion.
  2. Construction cost was supplied by the Authority's engineer. We used it as given and did not verify it.
  3. Based aircraft counts, the waiting lists, flowage records and rent schedules were supplied by airport management and are assumed to be accurate.
  4. Rents at the competing airports were confirmed with each sponsor or operator as of the date of the study.
  5. The waiting list survey records what each respondent said it would do. A statement of intent is not a commitment, and Section 4 tests the difference.
  6. Projections are estimates of future income and expense under stated assumptions. Actual results will differ.
  7. The analysis is before any tax, and assumes the Authority pays no property or income tax on its own buildings.
  8. We did not study environmental conditions, airspace, drainage or utility capacity. The study assumes the east hangar area can be developed as shown on the airport layout plan.
  9. Grant and loan funding is described from published federal law and policy as of the date of the study. Eligibility is determined by the funding agency.
  10. The study is for the use of the Board of Commissioners in deciding on the east hangar area. It should not be relied on by others or for another purpose.

Addendum B. Terms Used

TermMeaning in this study
Box hangarA free-standing rectangular hangar for one tenant. The units studied are 60 by 60 feet
Capital renewalA periodic outlay to replace building components such as doors and roofing
Effective gross incomeRent at full occupancy less vacancy and collection loss
EntitlementFederal funds apportioned to an airport each year by formula
Ground leaseA lease of land on which the tenant builds. The improvements pass to the Authority when it ends
Internal rate of returnThe discount rate at which the present value of a project's cash flow equals its cost
Net operating incomeEffective gross income less operating expenses and reserves
Net present valueThe present value of a project's cash flow less its cost. A positive figure means the project earns more than the discount rate
Nonprimary airportAn airport that is not a primary commercial service airport. Most general aviation airports are nonprimary
Return on costStabilized net operating income divided by development cost
ReversionThe passing of a tenant's improvements to the Authority at the end of a ground lease
T-hangarA building of nested T-shaped units, each sized for one light aircraft

Addendum C. Authorities and Sources

Statutory and policy references are summarized by the firm and are not legal advice.

  1. 49 U.S.C. 47102(24), 47107(a)(21), 47109(h), 47110(h), 47114(d)(2)(A) and 47117(b)(1). Discussed in the firm's paper on federal hangar funding.
  2. Infrastructure Investment and Jobs Act, Public Law 117-58, division J, title VIII (Airport Infrastructure Grants).
  3. Federal Aviation Administration. Airport Sponsor Assurances (April 2025): Assurances 22, 24, 29 and 38. faa.gov
  4. Federal Aviation Administration. Order 5190.6C, Airport Compliance Manual, effective February 20, 2026, paragraph 17.9. See what Order 5190.6C changes.
  5. Federal Aviation Administration. Policy on the Non-Aeronautical Use of Airport Hangars, 81 Fed. Reg. 38906 (June 15, 2016). Summarized at the hangar use policy.
  6. Wexley Field Airport Authority. Leasing Policy and Rents and Fees Policy, effective July 1, 2026. A sample document.
  7. Turner Building Cost Index, annual changes 2022 through 2025, and the Minnesota Department of Transportation hangar loan program, as reported in the firm's papers on hangar waiting lists and FAA rate policy and federal hangar funding.

Addendum D. Index of Exhibits

1Summary of findings2The limits within which each finding holds3The assumptions behind the financial analysis4Based aircraft at Wexley Field, from airport records5Competing airports, hangar rent and occupancy6Where the 186 based aircraft are stored, from airport records7Waiting list survey8Demand at each rent tested, charted9Units filled if only a share of the names that said they would sign do so10Where the names that would sign keep their aircraft today11Comparable rents adjusted to a new unit at Wexley Field. Adjustments are applied in sequence12Market rent and the rent that would return the Authority's rate on the cost of each building13T-hangar development cost, from the Authority's engineer14Box hangar development cost, from the Authority's engineer15What the engineer's estimate includes and leaves out16T-hangar stabilized operating statement, first year dollars17T-hangar cash flow, selected years18T-hangar net present value by grant share19Present value of cash flow by decade, for both buildings, at 6.50 percent20Cumulative present value against cost, charted21T-hangar net present value under five ways of funding the building22Box hangar stabilized operating statement, first year dollars23Box hangar cash flow, selected years24Box hangar net present value under rent and cost changes25Box hangar break-even points, each input moved alone26Debt service coverage if the Authority borrows the full cost of the box hangars at 5.00 percent27Simulation of cost, rent, growth and vacancy28Range of net present value in the simulation, charted29Income outside the buildings that the financial analysis leaves out. The split between new and existing tenants follows the survey30Authority-built and ground lease alternatives for the box hangar sites31The ground lease from both sides, by length of term32Risk carried under each alternative33Federal rules on funding a hangar and what each means here34How the Authority's leasing policy applies to a ground lease of a box hangar site35Implementation steps

Planning a hangar project?

Send a short note about the airport and the project, and we will reply with a scope and a fee quote. If you would like a copy of this sample, ask and we will send one.

Discuss an Engagement

Valuationtakesflight@outlook.com

Questions about hangar feasibility studies

What is a hangar feasibility study?

A hangar feasibility study tests whether a proposed hangar project has enough demand, at a rent high enough, to pay for what it costs to build. This sample covers a ten unit T-hangar building and four box hangars. It tests the waiting lists at market rent, concludes rent for the new units, and compares the value of the income to the development cost. The box hangars pass with a net present value of $363,820. The T-hangars do not, at ($917,042).

Is a hangar waiting list proof of demand?

Not by itself. A waiting list shows demand at the rent charged today. In this sample the two lists hold 77 names, and 24 of them would sign at the rent a new building needs. The study contacts every name and counts only those who would commit at the tested rent.

Do new T-hangars pay for themselves?

In this sample they do not. Ten units at $450 per month produce $40,880 of net operating income against a cost of $1,687,840, a return on cost of 2.42 percent. The rent that would cover the cost is $838 per month, well above what the market would pay. The building works only if grants cover at least 54.3 percent of the cost.

Should an airport build hangars or ground lease the sites?

It depends on the numbers at that airport. In this sample, building the box hangars is worth $363,820 to the sponsor and requires $2,328,704 of capital. Leasing the same sites to tenants who build is worth $642,337 and requires none, because the sponsor collects ground rent for 30 years and then receives the buildings at reversion.

Can federal grants pay for a hangar?

At a nonprimary airport they can, within limits. Under 49 U.S.C. 47110(h) the federal share must come from the airport's own nonprimary entitlement, and the sponsor must first provide for its airside needs. The entitlement is $150,000 a year and may be banked for up to four years, so about $600,000 is available. In this sample that covers 35.5 percent of the T-hangar cost, against the 54.3 percent the building needs.

How long should a hangar ground lease run?

Long enough for the tenant to recover its investment. In this sample a tenant that builds a box hangar for its own aircraft earns 5.80 percent over a 30 year term and reaches 6.50 percent at 35 years. Each added year moves value from the airport to the tenant: the airport's interest in the four sites is worth $642,337 at 30 years and $307,081 at 40. Exhibit 31 shows both sides.

Who supplies the construction cost in a feasibility study?

The client's engineer or builder. We study demand, rent and financial return. We do not estimate construction cost or design the site.

Can I download this sample study?

The sample is published as a web page, so there is nothing to download. If you would like a copy, email Valuationtakesflight@outlook.com and we will send one.

More on the method behind this study: hangar feasibility study engagements, airport hangar rent studies, hangar waiting lists and FAA rate policy, and where federal dollars are building hangars.